Abstract:
This article develops an integrated JIT lot-splitting model for a single supplier and a single buyer. In this model we consider reduction of setup time, and the optimal lot size are obtained due to reduced setup time in the context of joint optimization for both buyer and supplier, under deterministic condition with a single product. Two cases are discussed: Single Delivery (SD) case, and Multiple Delivery (MD) case. These two cases are investigated before and after setup time reduction. The proposed model determines the optimal order quantity (Q*), optimal rate of setup reduction (R*), and the optimal number of deliveries (N*) -just for multiple deliveries case- on the joint total cost for both buyer and supplier. For optimizing our model two algorithm including Gradient Search and Particle Swarm Optimization (PSO), which is a population-based search algorithm, are applied. Finally numerical example and sensitivity analysis are provided to compare the aggregate total cost for two cases and effectiveness of the considered algorithm. The results show that which policy for lot-sizing is leading to less total cost.
similar resources
An Integrated Production-Inventory Model with Backorder and Lot for Lot Policy
inventory model, backorder buyer , vendor, lot for lot policy In this paper, an inventory model for two-stage supply chain is investigated. A supply chain with single vendor and single buyer is considered. We assume that shortage as a backorder is allowed for the buyer and the vendor makes the production set up every time the buyer places an order and supplies on a lot for lot basis...
full textAn Integrated Inventory Model with Controllable Lead time and Setup Cost Reduction for Defective and Non-Defective Items
In this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. The cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. Lead time is an important element in any inventory system. The proposed model is presents an integrated inventory model with controllable lead tim...
full textan integrated inventory model with controllable lead time and setup cost reduction for defective and non-defective items
in this paper, the study deals with the lead time and setup reduction problem in the vendor-purchaser integrated inventory model. the cost of capital (i.e., opportunity cost) is one of the key factors in making the inventory and investment decisions. lead time is an important element in any inventory system. the proposed model is presents an integrated inventory model with controllable lead tim...
full textAn integrated production-inventory model with backorder and lot for lot policy in fuzzy sense
In this paper, an inventory model for two-stage supply chain is investigated. A supply chain with single vendor and single buyer is considered. We assume that shortage as a backorder is allowed for the buyer and the vendor makes the production set up every time the buyer places an order and supplies on a lot for lot basis. With these assumptions, the joint economic lot size model is introduced ...
full textSetup time reduction: SMED-balancing integrated model for manufacturing systems with automated transfer
The importance of short setup times is increasing in every type of industry. It has been known how to address this problem for about 20 years. The SMED method, originally developed by the Japanese industrial engineer Shigeo Shingo for reducing the time to exchange dies, gives a really straightforward approach to improve existing setups. On the other hand, in the case of complex manufacturing sy...
full textOptimum Aggregate Inventory in the Lot Scheduling Problem with Non-Zero Setup Time
In this paper, the minimization of the maximum aggregate inventory of all products for the common cycle time approach to the scheduling problem of a multi-products single machine system is considered. In the case of non-zero set up time and limited resources, a simply and easy to apply rule has been obtained for this optimization problem. Using this rule, one can obtain the optimal production s...
full textMy Resources
Journal title
volume 24 issue 1
pages 37- 46
publication date 2013-02
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023