Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem becomes a flexible flow shop problem (FFSP). FFSP which contains all the complexities involved in a simple flow shop and parallel machine scheduling problems is a well-known NP-hard (Non-deterministic polynomial time) problem. Owing to high computational complexity involved in solving these problems, it is not always possible to obtain an optimal solution in a reasonable computation time. To obtain near-optimal solutions in a reasonable computation time, a large variety of meta-heuristics have been proposed in the past. However, tuning algorithm-specific parameters for solving FFSP is rather tricky and time consuming. To address this limitation, teaching–learning-based optimization (TLBO) and JAYA algorithm are chosen for the study because these are not only recent meta-heuristics but they do not require tuning of algorithm-specific parameters. Although these algorithms seem to be elegant, they lose solution diversity after few iterations and get trapped at the local optima. To alleviate such drawback, a new local search procedure is proposed in this paper to improve the solution quality. Further, mutation strategy (inspired from genetic algorithm) is incorporated in the basic algorithm to maintain solution diversity in the population. Computational experiments have been conducted on standard benchmark problems to calculate makespan and computational time. It is found that the rate of convergence of TLBO is superior to JAYA. From the results, it is found that TLBO and JAYA outperform many algorithms reported in the literature and can be treated as efficient methods for solving the FFSP.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Three Algorithms for Flexible Flow-shop Scheduling

Scheduling is an important process widely used in manufacturing, production, management, computer science, and so on. Appropriate scheduling can reduce material handling costs and time. Finding good schedules for given sets of jobs can thus help factory supervisors effectively control job flows and provide solutions for job sequencing. In simple flow shop problems, each machine operation center...

full text

COVERT Based Algorithms for Solving the Generalized Tardiness Flow Shop Problems

Four heuristic algorithms are developed for solving the generalized version of tardiness flow shop problems. We consider the generalized tardiness flow shop model with minimization of the total tardiness as its performance measure. We modify the concept of cost over time (COVERT) for the generalized version of the flow shop tardiness model and employ this concept for developing four algorithms....

full text

Solving Flexible Flow-shop Problems by Lpt and Ln Scheduling Algorithms

Scheduling is an important process widely used in manufacturing, production, management, computer science, and so on. Appropriate scheduling not only reduces manufacturing costs but also reduces possibilities for violating due dates. Finding good schedules for given sets of jobs can thus help factory supervisors effectively control job flows and provide solutions for job sequencing. In simple f...

full text

Single-Pass-Based Heuristic Algorithms for Group Flexible Flow-shop Scheduling Problems

In this paper, four algorithms based on some single-pass heuristics are proposed to solve the flexible flow-shop group scheduling problems with more than two machine centers, which have the same number of parallel machines. Single-pass heuristics need less computation time than multiple-pass ones. The single-pass heuristics adopted in the paper includes the PT, the Palmer and the Gupta algorith...

full text

Batch Scheduling in Flexible Flow Shop

In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...

full text

Batch Scheduling in Flexible Flow Shop

In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 14  issue 3

pages  -

publication date 2018-09-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023