Flexible Scheduling of Active Distribution Networks for Market Participation with Considering DGs Availability

Authors

  • M.-R Haghifam Professor, Electrical & Computer Dep., Tarbiat Modarres University, Tehran, IRAN
  • Milad Hoseinpour Department of Electrical & Computer Engineering, Tarbiat Modares University,Tehran,Iran
Abstract:

The availability of sufficient and economic online capacity to support the network while encountering disturbances and failures leading to supply and demand imbalance has a crucial role in today distribution networks with high share of Distributed Energy Resources (DERs), especially Renewable Energy Resources (RESs). This paper proposes a two-stage decision making framework for the Distribution Management System (DMS) to flexibly optimize the day-ahead schedule of DERs and market participation of distribution networks under uncertainties, imposed by DGs outage and wind generators. The uncertainties are modeled via scenarios and convolved with each other, and then the joint scenario set is applied in the proposed two-stage programming model. Also the role of network constraints on DMS decisions are seen via a linearized AC power flow model and finally the resulted proposed framework is based on mixed-integer-linear programming (MILP) layout solved by CPLEX 12.6. To examine the effectiveness of the proposed framework, it is used for decision making of DERs scheduling and market participation strategy of a test distribution network.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Flexible job shop scheduling under availability constraints

In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...

full text

Assessing the Impact of Size and Site of DGs and SMs in Active Distribution Networks for Energy Losses Cost

The presence of responsive loads in the promising active distribution networks (ADNs) would definitely affect the power system problems such as distributed generations (DGs) studies. Hence, an optimal procedure is proposed herein which takes into account the simultaneous placement of DGs and smart meters (SMs) in ADNs. SMs are taken into consideration for the sake of successful implementing of ...

full text

flexible job shop scheduling under availability constraints

in this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. this study seems utterly new and it is applicable to any performance measure based on the completion time. the in...

full text

Optimal Simultaneous Sizing and Siting of DGs and Smart Meters Considering Voltage Profile Improvement in Active Distribution Networks

This paper investigates the effect of simultaneous placement of DGs and smart meters (SMs), on voltage profile improvement in active distribution networks (ADNs). A substantial center of attention has recently been on responsive loads initiated in power system problem studies such as distributed generations (DGs). Existence of responsive loads in active distribution networks (ADNs) would have u...

full text

optimal pseudo-dynamic planning of mv radial distribution networks considering power transit for retail market trading

the paper tries to present an improved mathematical model for distribution companies (discos) in order to solve distribution network expansion planning (dnep) problems in the presence of certain resources of distributed generations (dgs) entitled small scale gas engines in the medium voltage grids. with the aim of minimizing investment and operation costs, the recommended model combines a compr...

full text

Scheduling of Flexible Manufacturing Systems Considering Maintenance

Scheduling of flexible manufacturing systems is one of problems in NP-Hard optimization. The aim of scheduling of these systems is to maximize the system efficiency by finding an optimal planning for a better cooperation among various processes. In recent years many algorithms proposed to solve this problem, and most of them are based on heuristic methods. In This paper we have proposed a new a...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 06  issue 01

pages  7- 13

publication date 2017-06-04

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023