Estimating the Available Water in the Watershed using System Dynamics Hydrological Model (Case Study: Ilam Watershed)

Authors

  • Amin Sarang School of Environment, College of Engineering, University of Tehran, Tehran, Iran
  • Hamid Abdolabadi School of Environment, College of Engineering, University of Tehran, Tehran, Iran
  • John Little Department of Civil and Environmental Engineering, Virginia Tech, Blacksburg, USA
  • Mojtaba Ardestani School of Environment, College of Engineering, University of Tehran, Tehran, Iran
Abstract:

Hydrological models provide water managers with the available amount of water in the watershed. In this paper, we firstly developed a system dynamics model to calculate the available amount of water in the watershed. Then, we defined two scenarios one of which is the development scenario describing how land use changes can affect water availability in the watershed. Next, we divided the watershed into upstream and downstream assuming that these two sub-watersheds have different physical features including soil type and land cover to find out how the available water changes. The system dynamics model includes three main components of the hydrologic processes: rainfall-runoff model, snow accumulation, and groundwater. The model calculates runoff at the outlet of a watershed and sub-watersheds with monthly time step. We applied the developed model to the Ilam watershed to demonstrate the capability of the model in estimating runoff volume and available water. We calibrated model coefficients based on minimizing the model’s error in estimating the out flow of the watershed. The error was measured using the Nash-Sutcliff efficiency coefficient, the Pierson correlation coefficient, and the standard error. Specific tests such as the dimensional analysis test, and extreme conditions test were utilized to assess the structural accuracy of the system dynamics model. Results showed the appropriate accordance of the model’s output with the observed data by a value of the Nash-Sutcliff coefficient (Ens) close to 1, the rather high data correlation coefficient (R), and also a low standard error for the model’s calibration and verification periods.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

The effect of Urban Development on Watershed Hydrological Properties (case study: Tajrish Watershed)

The effect of Urban Development on Watershed Hydrological Properties (case study: Tajrish Watershed) Throughout the human history, societies and rivers have been closely linked, so that the human civilization began from the riverside (Stevaux et al. 2009 (. The quantitative and qualitative characteristic of river is vulnerable to land-use changes (Kang et al. 2010). Natural and urban watershed...

full text

Simulation of Water Balance Components Using a Distributed Hydrological Model in Taleghan Watershed

Water changes information in the hydrological system, in time and space, as an environmental issue takes heed of managers and decision makers in watershed management and river engineering, which can be addressed by using spatially distributed modeling. In this study simulation of water balance components in Taleghan mountainous watershed is performed using the spatially distributed hydrological...

full text

Hydrological Modeling of the Jiaoyi Watershed (China) Using HSPF Model

A watershed hydrological model, hydrological simulation program-Fortran (HSPF), was applied to simulate the spatial and temporal variation of hydrological processes in the Jiaoyi watershed of Huaihe River Basin, the heaviest shortage of water resources and polluted area in China. The model was calibrated using the years 2001-2004 and validated with data from 2005 to 2006. Calibration and valida...

full text

Assessment of the Monthly Water Balance in an Arid Region Using TM Model and GIS (Case Study: Pishkouh Watershed, Iran)

Monthly discharge is one of the most important factors considered in designs and hydrological works. Some watersheds are not equipped with needed hydrometric equipment. In such a case average monthly discharge could be estimated from regional monthly water balance models of representative watersheds. In this study, Thornthwaite & Mather (TM) model were used in the Pishkouh watershed in arid cli...

full text

evaluating the impact of climate change on runoff using hydrological model (case study: bazoft-samsami watershed)

increasing greenhouse gases in recent decades and increasing its resulting temperature has causes the imbalance of the earth’s climate system and widespread climate changes in most regions of earth planet. development strategic policy in this area has been forced with a big challenge because of the need for water in the central region on the one hand and water resource constraints on the other ...

full text

Stochastic Watershed Water Quality Simulation for Tmdl Development – a Case Study in the Newport Bay Watershed

Systematic consideration of uncertainty in data, model structure, and other factors is generally unaddressed in most Total Maximum Daily Load (TMDL) calculations. Our previous studies developed the Management Objectives Constrained Analysis of Uncertainty (MOCAU) approach as an uncertainty analysis technique specifically for watershed water quality models, based on a synthetic case. In this stu...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 2  issue 4

pages  265- 280

publication date 2018-11-01

By following a journal you will be notified via email when a new issue of this journal is published.