DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Authors

  • K. Zia Dabirian
  • K. Zia Ghazvini
  • M. Khanzadi
Abstract:

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the highway activities is a good reason for schedulers to use linear scheduling methods in order to estimate the time of the project. One of the most important factors in linear projects is considering the effect of the activities productivity on scheduling. The first part of the research has been proposed to quantify the main equation of the identified factors for predicting the daily production rates of the embankment activity. The second part is scheduling the highway construction projects by developing the LSMvpr method based on the application of the embankment activity productivity equation. The purpose of the research is to develop the LSMvpr method for scheduling the highway construction projects by considering the concept of activity productivity in the shape of an equation varying by independent variables changes. By the use of multiple regression analysis the coefficients of affecting factors have been calculated in order to gain a production rate equation for predicting the embankment activity productivity. A software package has been presented for scheduling a highway construction project by coding in MATLAB. The offered software used for validating the model for scheduling the highway construction projects.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

developing a pattern based on speech acts and language functions for developing materials for the course “ the study of islamic texts translation”

هدف پژوهش حاضر ارائه ی الگویی بر اساس کنش گفتار و کارکرد زبان برای تدوین مطالب درس "بررسی آثار ترجمه شده ی اسلامی" می باشد. در الگوی جدید، جهت تدوین مطالب بهتر و جذاب تر، بر خلاف کتاب-های موجود، از مدل های سطوح گفتارِ آستین (1962)، گروه بندی عملکردهای گفتارِ سرل (1976) و کارکرد زبانیِ هالیدی (1978) بهره جسته شده است. برای این منظور، 57 آیه ی شریفه، به صورت تصادفی از بخش-های مختلف قرآن انتخاب گردید...

15 صفحه اول

Highway Embankment Construction Procedure

some heavy clay soils of the A6 and A7 types with tar emul­ sions and cutbacks on an experimental subgrade stabilization during the summer of 1937, we found that this type of soil stabilization presents some very different problems from those of soil-aggregate stabilization. Soil-cement stabilization, as described by Mr. Myers, also presents some interesting problems. According to its claims, t...

full text

Production Rate Determination for Linear Construction Projects Based on Linear Scheduling Method

Traditional scheduling methods such as CPM or PERT have been found to be inappropriate for scheduling the linear construction projects. According to the limitations of Traditional scheduling methods, Linear Scheduling Method (LSM) is proposed specifically for linear construction projects. Aiming at overcoming the limitations of network technology in deciding the production rate of linear constr...

full text

A Project Scheduling Method Based on Fuzzy Theory

In this paper a new method based on fuzzy theory is developed to solve the project scheduling problem under fuzzy environment. Assuming that the duration of activities are trapezoidal fuzzy numbers (TFN), in this method we compute several project characteristics such as earliest times, latest times, and, slack times in term of TFN. In this method, we introduce a new approach which we call modif...

full text

Stability Assessment Metamorphic Approach (SAMA) for Effective Scheduling based on Fault Tolerance in Computational Grid

Grid Computing allows coordinated and controlled resource sharing and problem solving in multi-institutional, dynamic virtual organizations. Moreover, fault tolerance and task scheduling is an important issue for large scale computational grid because of its unreliable nature of grid resources. Commonly exploited techniques to realize fault tolerance is periodic Checkpointing that periodically ...

full text

Fuzzy Scheduling of Repetitive Construction Projects

Uncertainty is an inherent characteristic of construction projects. Neglecting uncertainties associated with different input parameters in the planning stage could well lead to misleading and/or unachievable project schedules. The objective of this paper is to present a new approach towards scheduling repetitive construction projects while accounting for uncertainty. The paper presents an algor...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 3  issue 4

pages  601- 616

publication date 2013-10

By following a journal you will be notified via email when a new issue of this journal is published.

Keywords

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023