Detecting communities of workforces for the multi-skill resource-constrained project scheduling problem: A dandelion solution approach

Authors

  • Vahid Baradaran Department of Industrial Engineering, Islamic Azad University, Tehran North Branch, Tehran, Iran
Abstract:

This paper proposes a new mixed-integer model for the multi-skill resource-constrained project scheduling problem (MSRCPSP). The interactions between workers are represented as undirected networks. Therefore, for each required skill, an undirected network is formed which shows the relations of human resources. In this paper, community detection in networks is used to find the most compatible working groups to perform project activities. In this respect, a greedy algorithm (GRA) is proposed to detect the most compatible communities of workers. The proposed greedy algorithm maximizes modularity as a well-known objective to find high-quality communities of workers. Besides, a new heuristic is developed to assign workers to activities based on the communities obtained by the GRA. The MSRCPSP is an NP-hard optimization problem with the objective of minimizing the makespan of the project. Therefore, a dandelion algorithm (DA), which is a meta-heuristic, is proposed to solve the problem. The dandelion algorithm is used to solve test problems of the iMOPSE dataset. To validate the outputs of the proposed method, three other meta-heuristics including genetic algorithm (GA), harmony search (HS) algorithm, and differential evolution (DE) method are employed. The Taguchi method is hired to tune all algorithms. These algorithms are compared with each other in terms of several performance measures. The results show the superiority of the dandelion algorithm in terms of all performance measures.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...

full text

the combinatorial multi-mode resource constrained multi-project scheduling problem

this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...

full text

A THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM

The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...

full text

solution of security constrained unit commitment problem by a new multi-objective optimization method

چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...

A multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations

The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...

full text

A Reactive Approach for the Multi-Skill Project Scheduling Problem

This paper deals with the Multi-Skill Project Scheduling Problem (MSPSP) in case of disruptions. First, the problem is defined, then a way to build a first schedule is introduced and finally the reactive approach used to repare the schedule is presented.

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 12  issue Special issue on Project Management and Control

pages  72- 99

publication date 2019-02-05

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023