Desertification risk assessment and management program
Authors
Abstract:
Risk assessment provides the possibility of planning and management to prevent and reduce the risk of desertification. The present study is aimed to assess the hazard and risk of desertification and to develop management programs in the semi-arid western regions of Golestan Province in Iran. Desertification rate was obtained using the Iranian model of desertification potential assessment. Since the rating system was considered for the indicators, data analyses were carried out according to the Mann-Whitney test. The risk of desertification was calculated based on hazard, elements at risk and vulnerability assessment maps. The intensity of desertification was estimated to be medium. Among the factors affecting desertification, agriculture by the weighted average of 3.22 had the highest effect, followed by soil, vegetation, water and wind erosion criteria by weighted averages of 2.45, 2.32, 2.15 and 1.6 respectively. Desertification risk assessment results also showed that about 78% of central and northern parts of the region, with the largest population and residential centers, surface and underground water resources, agriculture and horticulture, is confronted with a high to very high degree of risk. Management plans and control measures, based on risk values were presented in four activities (with two management priorities under critical and non-critical conditions). For the management program with the largest area. Control measures and strategies such as the establishment of halophytic and xerophytic plants, drainage networks, resilient facilities and infrastructure were proposed. Reducing the risk of desertification, could play a crucial role in the sustainable development of drylands and desert ecosystems.
similar resources
desertification risk assessment and management program
risk assessment provides the possibility of planning and management to prevent and reduce the risk of desertification. the present study is aimed to assess the hazard and risk of desertification and to develop management programs in the semi-arid western regions of golestan province in iran. desertification rate was obtained using the iranian model of desertification potential assessment. since...
full textAssessment of desertification hazard, risk and development of management plans
About 80 percent of Iran is arid and semi-arid and about 35 percent of this area is susceptible to desertification hazard. Therefore desertification assessment and identification of the most important criteria for the assessment of risk and a basis for development of management plans is essential. This research was conducted in the semi-arid region of Agh-Band in the Golestan province, Iran wit...
full textDesertification risk assessment in southern Mediterranean areas
The paper deals some important aspects concerning the study of desertification phenomenon that has significantly interested all European countries of the Mediterranean basin in the last decades. The territorial sensibility, qualitatively and/or quantitatively, of the risk related to the desertification processes has been valued as grade of susceptibility to the phenomenon in the study area, wit...
full textP105: Geographic Information Systems on Accident Risk Assessment and Management
لطفاً به چکیده انگلیسی مراجعه شود.
full textAssessment of Desertification Risk in agricultural land in south of Iran
In many countries, studies to determine the severity of desertification and providing land plans to implement desertification. One of the models is modified MEDALUS or Iranian model (IMDPA), has been used in present research in order to investigate desertification situation in the Tashk region of Fars province. In this research, the modified IMDPA model used with emphasis on the water, soil and...
full textRisk assessment and water management
In order to implement water management in a sustainable way, the related decisionmaking processes have to take the ecological and socio-economic consequences into account. In the Netherlands, policy makers struggle with the question how they can deal with risks associated with flooding. Flood prevention is one of the pillars of water management that aims at reducing the likelihood of flooding a...
full textMy Resources
Journal title
volume 2 issue 4
pages 365- 380
publication date 2016-12-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023