Critical Path Method for Flexible Job Shop Scheduling Problem with Preemption

Authors

Abstract:

This paper addressed a Flexible Job shop Scheduling Problem (FJSP) with the objective of minimization of maximum completion time (Cmax) which job splitting or lot streaming is allowed. Lot streaming is an important technique that has been used widely to reduce completion time of a production system. Due to the complexity of the problem; exact optimization techniques such as branch and bound algorithm will lose their efficiency at medium and large dimensions. Thus, metaheuristic techniques are good options in order to obtain high quality solutions within a reasonable computational time. In this study, firstly, the considered problems are solved in both permitted and not permitted of lot streaming by means of memetic algorithm and then the obtained solutions will be improved by using the critical path method heuristic. The numerical results indicate the high efficiency of the memetic algorithm in comparison with the previous methods; in addition, adding preemption and using allowable idle machines have led to a considerable improvement in the objective function.

Download for Free

Sign up for free to access the full text

Already have an account?login

similar resources

Solving Flexible Job Shop Scheduling with Multi Objective Approach

  In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...

full text

Flexible job shop scheduling under availability constraints

In this paper, an exact geometric algorithm is presented for solving two-job sequencing and scheduling problems in flexible flow shop and job shop environments while the resources are (un)available in some time periods and processors (un)availability is the same in all work centers. This study seems utterly new and it is applicable to any performance measure based on the completion time. The in...

full text

Single Objective Evolutionary Algorithm for Flexible Job-shop Scheduling Problem

A meta-heuristic approach for solving the flexible job-shop scheduling problem (FJSP) is presented in this study. This problem consists of two sub-problems, the routing problem and the sequencing problem and is among the hardest combinatorial optimization problems. We propose a Evolutionary Algorithm (EA) for the FJSP. Our algorithm uses several different rules for generating the initial popula...

full text

Multiobjective Artificial Immune Algorithm for Flexible Job Shop Scheduling Problem

Flexible Job shop scheduling is very important in production management and combinatorial optimization. It is NP-hard problem and consists of two sub-problems: sequencing and assignment. Multiobjective Flexible Job-Shop Scheduling Problems (MFJSSP) is formulated as three-objective problem which minimizes completion time (makespan), critical machine workload and total work load of all machines. ...

full text

Genetic algorithm for the flexible job-shop scheduling problem

In this paper, we propose a new optimization technique, the hierarchical multi-space competitive distributed genetic algorithm (HmcDGA), which is effective for the hierarchical optimization problem. It is an extension of the multi-space competitive distributed genetic algorithm (mcDGA), which was proposed by the authors. The mcDGA efficiently finds an optimal solution with a low computational c...

full text

Iterative Flattening Search for the Flexible Job Shop Scheduling Problem

This paper presents a meta-heuristic algorithm for solving the Flexible Job Shop Scheduling Problem (FJSSP). This strategy, known as Iterative Flattening Search (IFS), iteratively applies a relaxationstep, in which a subset of scheduling decisions are randomly retracted from the current solution; and a solving-step, in which a new solution is incrementally recomputed from this partial schedule....

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 30  issue 2

pages  261- 269

publication date 2017-02-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023