Concurrent Locomotive Assignment and Freight Train Scheduling

Authors

Abstract:

The locomotive assignment and the freight train scheduling are important problems in railway transportation. Freight cars are coupled to form a freight rake. The freight rake becomes a train when a locomotive is coupled to it. The locomotive assignment problem assigns locomotives to a set of freight rakes in a way that, with minimum locomotive deadheading time, rake coupling delay and locomotive coupling delay all freight rakes are hauled to their destinations. Scheduling freight trains consists of sequencing and ordering freight trains during the non-usage time between passenger trains but with no interference and with minimum delay times. Solving these two problems simultaneously is of high importance and can be highly effective in decreasing costs for rail transportation. In this paper, we aim to minimize the operational costs for the locomotive assignment and the freight train scheduling by solving these two problems concurrently. To meet this objective, an efficient and effective algorithm based on the ant colony system is proposed. To evaluate the performance of the proposed solution method, twenty-five test problems, which are based on the conditions of Iran Railways, are solved and the computational results are reported.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Locomotive and Wagon Scheduling in Freight Transport

We present a new model for a strategic locomotive scheduling problem arising at the Deutsche Bahn AG. The model is based on a multi-commodity min-cost flow formulation that is also used for public bus scheduling problems. However, several new aspects have to be additionally taken into account, such as cyclic departures of the trains, time windows on starting and arrival times, network-load depe...

full text

Freight Locomotive Rescheduling and Uncovered Train Detection during Disruptions

This paper discusses optimization of freight train locomotive rescheduling under a disrupted situation in the daily operations in Japan. In the light of the current framework of dispatching processes that passenger railway operators modify the entire timetables, the adjusted timetable is distributed to a freight train operator. We solve the locomotive rescheduling problem for the given adjusted...

full text

Locomotive assignment problem with train precedence using genetic algorithm

This paper aims to study the locomotive assignment problem which is very important for railway companies, in view of high cost of operating locomotives. This problem is to determine the minimum cost assignment of homogeneous locomotives located in some central depots to a set of pre-scheduled trains in order to provide sufficient power to pull the trains from their origins to their destinations...

full text

Locomotive Assignment Optimization including Train Delays

Intention– Cyclic locomotive assignment planning is a specific type of organization of locomotive usage, and in fact, it means putting the complete workload to a closed chain, which is repeated periodically. The concept of cyclic locomotive assignment planning type organization in the area of train traction has proven in practice as the best one, but as it is made for in-advance defined timetab...

full text

Locomotive Scheduling in Freight Transport at Mpopoma Train Station in Bulawayo for the Southern Region, Zimbabwe

In this paper the results of a locomotive scheduling problem faced by National Railways of Zimbabwe (NRZ) are presented. The study is in part inspired by similar optimization problems in public transports. This paper focuses on the planning version of the locomotive scheduling model (LSM), where there are multiple types of locomotives and a decision is made as to which set of locomotives is to ...

full text

A Dynamic Row/Column Management Algorithm for Freight Train Scheduling

We propose a new dynamic row/column management algorithm for freight train scheduling in a single track railway system. While many papers have already been devoted to train scheduling, previously published optimization models still suffer from scalability issues, even for single track railway systems. Moreover, very few of them take into account the capacity constraints, i.e., the number of alt...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 27  issue 4

pages  321- 335

publication date 2016-12

By following a journal you will be notified via email when a new issue of this journal is published.

Keywords

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023