Concurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation
author
Abstract:
Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material embankment activities regarding large-scale dam projects of Iran. The model develops a methodology for concurrent management of resources and revenue/expenditure estimation of dam's projects. This real-time control allows managers to simulate several scenarios and adopt the capability of complicated working policies. Results validation shows that the proposed model will assist project managers as a decision support tool in cost-efficient executive policymaking on resource configuration.
similar resources
Discrete-Event Simulation for Hospital Resource Planning – Possibilities and Requirements
The delivery of health care services has been under pressure due to limited funding and increasing demand. This has highlighted the need to increase not only the effectiveness but also the efficiency of health care delivery. Discrete-event simulation has been suggested as an analysis tool in health care management to support the planning of health care resources. The overall purpose of this the...
full textConcurrent and comparative discrete event simulation
Introducing a new hobby for other people may inspire them to join with you. Reading, as one of mutual hobby, is considered as the very easy hobby to do. But, many people are not interested in this hobby. Why? Boring is the reason of why. However, this feel actually can deal with the book and time of you reading. Yeah, one that we will refer to break the boredom in reading is choosing concurrent...
full textEvaluating Contention Management Using Discrete Event Simulation
Understanding the behavior and benefits of contention managers is important for designing transactional memory implementations. Contention manager design is closely tied to other design decisions in a transaction memory implementation, and therefore experiments to compare the behaviors of contention managers are difficult. This paper presents a discrete event simulator that allows researchers t...
full textModeling System Architecture and Resource Constraints Using Discrete-Event Simulation
Optimizing system resource utilization is a key design objective for system engineers in communications, electronics, and other industries. System resources such as processors, memory, or bandwidth on a communication bus are often shared by various components in the system. To understand the utilization of a shared resource, system engineers must do two things: identify constraints on the resou...
full textA Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects
Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...
full textMy Resources
Journal title
volume 28 issue 4
pages 461- 481
publication date 2017-11
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023