Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran
Authors
Abstract:
Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine.
similar resources
data mining rules and classification methods in insurance: the case of collision insurance
assigning premium to the insurance contract in iran mostly has based on some old rules have been authorized by government, in such a situation predicting premium by analyzing database and it’s characteristics will be definitely such a big mistake. therefore the most beneficial information one can gathered from these data is the amount of loss happens during one contract to predicting insurance ...
15 صفحه اولNoise variability in underground room and pillar coal mines.
Noise in an underground coal mine has dominant components generated mainly from 3 sources: (a) continuous mining machines, (b) roof bolters, and (c) cars/vehicles used to transport personnel and/or coal. Each of these 3 noise sources also has a number of well-defined sub-sources with their own noise characteristics. Sound level meters were used to collect noise data in the form of instantaneous...
full textthe survey of the virtual higher education in iran and the ways of its development and improvement
این پژوهش با هدف "بررسی وضعیت موجود آموزش عالی مجازی در ایران و راههای توسعه و ارتقای آن " و با روش توصیفی-تحلیلی و پیمایشی صورت پذیرفته است. بررسی اسنادو مدارک موجود در زمینه آموزش مجازی نشان داد تعداد دانشجویان و مقاطع تحصیلی و رشته محل های دوره های الکترونیکی چندان مطلوب نبوده و از نظر کیفی نیز وضعیت شاخص خدمات آموزشی اساتید و وضعیت شبکه اینترنت در محیط آموزش مجازی نامطلوب است.
the search for the self in becketts theatre: waiting for godot and endgame
this thesis is based upon the works of samuel beckett. one of the greatest writers of contemporary literature. here, i have tried to focus on one of the main themes in becketts works: the search for the real "me" or the real self, which is not only a problem to be solved for beckett man but also for each of us. i have tried to show becketts techniques in approaching this unattainable goal, base...
15 صفحه اولsupply and demand security of energy in central asia and the caucasus
امنیت انرژی به معنی عرضه مداوم و پایدار همراه با قیمت های معقول در حامل های انرژی، که تهدیدات امنیتی، سیاسی، اقتصادی، محیط زیستی و روانی را کاهش دهد. امروزه نفت و گاز تنها، کالای تجاری نیست بلکه بعنوان ابزار سیاسی مورد استفاده قرار می گیرد.اختلاف میان روسیه و اکراین بر سر انرژی در ژانویه 2006، تهدیدی برای امنیت انرژی اروپا ایجاد کرد. در این تحقیق ما تلاش کردیم که نقش انرژی آسیای میانه و قفقاز ر...
15 صفحه اولMy Resources
Journal title
volume 8 issue 17
pages 27- 37
publication date 2019-02-20
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023