Application of Sequential Gaussian Conditional Simulation to Underground Mine Design Under Grade Uncertainty

Authors

  • F. Sotoudeh Faculty of Mining, Petroleum & Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran
  • M. Ataei Faculty of Mining, Petroleum & Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran
  • R. Kakaie Faculty of Mining, Petroleum & Geophysics Engineering, Shahrood University of Technology, Shahrood, Iran
  • Y. Pourrahimian School of Mining and Petroleum Engineering, University of Alberta, Alberta, Canada
Abstract:

In mining projects, all uncertainties associated with a project must be considered to determine the feasibility study. Grade uncertainty is one of the major components of technical uncertainty that affects the variability of the project. Geostatistical simulation, as a reliable approach, is the most widely used method to quantify risk analysis to overcome the drawbacks of the estimation methods used for an entire ore body. In this work, all the algorithms developed by numerous researchers for optimization of the underground stope layout are reviewed. After that, a computer program called stope layout optimizer 3D is developed based on a previously proposed heuristic algorithm in order to incorporate the influence of grade variability in the final stope layout. Utilizing the sequential gaussian conditional simulation, 50 simulations and a kriging model are constructed for an underground copper vein deposit situated in the southwest of Iran, and the final stope layout is carried out separately. It can be observed that geostatistical simulation can effectively cope with the weakness of the kriging model. The final results obtained show that the frequency of economic value for all realizations varies between 6.7 M$ and 30.7 M$. This range of variation helps designers to make a better and lower risk decision under different conditions.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Choosing the Optimum Underground Mine Layout with Regard to Metal Price Uncertainty Using Expected Utility Theory

Metal price is one of the most important parameters in the calculation of cut- off grade. The cut- off grade has the main role in determination of mine layout. Mine layout actuates mineable reserve, mine life and economic profitability. Not considering the uncertainty in metal prices can lead to a non-optimal layout. In this paper optimum underground mine layout is determined by expected utilit...

full text

Access Optimisation Tools in Underground Mine Design

Optimisation tools which determine the best layout for access and haulage in an underground mine address an important and difficult mine design problem. The complexity of the problem can be compared to the task of optimising the final pit design in an open pit, together with the pit haul roads required. The strategic design of an underground mine layout must address the location of haulage shaf...

full text

Conditional Deduction Under Uncertainty

Conditional deduction in binary logic basically consists of deriving new statements from an existing set of statements and conditional rules. Modus Ponens, which is the classical example of a conditional deduction rule, expresses a conditional relationship between an antecedent and a consequent. A generalisation of Modus Ponens to probabilities in the form of probabilistic conditional inference...

full text

Application of VENTSIM 3D and mathematical programming to optimize underground mine ventilation network: A case study

Ventilation is a vital component of an underground mining operation, used to guarantee a safe atmosphere for workers and survive them from the hazardous and toxic gases. In the recent years, engineers have begun to apply new operation research techniques in order to optimize the ventilation systems to assist in achieving a regulatory compliance, reduce ventilation costs, and improve its efficie...

full text

Application of truncated gaussian simulation to ore-waste boundary modeling of Golgohar iron deposit

Truncated Gaussian Simulation (TGS) is a well-known method to generate realizations of the ore domains located in a spatial sequence. In geostatistical framework geological domains are normally utilized for stationary assumption. The ability to measure the uncertainty in the exact locations of the boundaries among different geological units is a common challenge for practitioners. As a simple a...

full text

Conditional progressive planning under uncertainty

In this article, we describe a possibilistic/probabilistic conditional planner called PTLplan. Being inspired by Bacchus and Kabanza’s TLplan, PTLplan is a progressive planner that uses strategic knowledge encoded in a temporal logic to reduce its search space. Actions effects and sensing can be context dependent and uncertain, and the information the planning agent has at each point in time is...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 11  issue 3

pages  695- 709

publication date 2020-07-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023