A Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching

author

Abstract:

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the machines of stage one in serial batch is the main contribution of this study. Machine set-up and ready time for all jobs are assumed to be zero and no Preemption is allowed. Machines may not breakdown but at times they may be idle. As the problem is NP-hard, a genetic algorithm is developed to give near optimal solutions. Since this problem has not been studied previously, therefore, a lower bound is developed for evaluating the performance of the proposed GA. Many test problems have been solved using GA and results compared with lower bound. Results showed GA can obtain a near optimal solution for small, median and large size problems in reasonable time.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Appling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...

full text

Two-Machine Flowshop Batching and Scheduling

We consider in this paper a two-machine flowshop scheduling problem in which the first machine processes jobs individually while the second machine processes jobs in batches. The forming of each batch on the second machine incurs a constant setup time. The objective is to minimize the makespan. This problem was previously shown to be NP-hard in the ordinary sense. In this paper, we first presen...

full text

Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration

This paper considers two scheduling problems for a two-machine flowshop where a single machine is followed by a batching machine. The first problem is that there is a transporter to carry the jobs between machines. The second problem is that there are deteriorating jobs to be processed on the single machine. For the first problem with minimizing the makespan, we formulate it as a mixed integer ...

full text

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

full text

Sequencing Hybrid Two-stage Flowshop with Dedicated Machines

We treat the n-job, two-stage hybrid flowshop problem with one machine in the first stage and two different machines in parallel in the second stage. The objective is to minimize the makespan. We demonstrate that the problem is NP-complete. We formulate a dynamic program, which is beyond our grasp for problems of more than 15 jobs. We have conducted experimentation to evaluate the time performa...

full text

A hybrid two-stage transportation and batch scheduling problem

We study the coordinated scheduling problem of hybrid batch production on a single batching machine and two-stage transportation connecting the production, where there is a crane available in the first-stage transportation that transports jobs from the warehouse to the machine and there is a vehicle available in the second-stage transportation to deliver jobs from the machine to the customer. A...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 25  issue 1

pages  55- 63

publication date 2014-02

By following a journal you will be notified via email when a new issue of this journal is published.

Keywords

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023