A Study Identifying Causes of Construction Waste Production and Applying Safety Management on Construction Site

Authors

  • Ahmad Zarei PhD Student, Department of Environmental Health Engineering, Tehran University, Tehran, Iran
  • Ali Asghar Najafpoor Department of Environmental Health Engineering, Health Sciences Research Center, School of Health, Mashhad University of Medical Sciences. Mashhad, Iran
  • Asma Zarei MSc Student, Department of Environmental Health Engineering, School of Health, Mashhad University of Medical Sciences. Mashhad, Iran
  • Farideh Jamali-Behnam MSc Student, Department of Environmental Health Engineering, School of Health, Mashhad University of Medical Sciences. Mashhad, Iran
  • Mohammad Vahedian-Shahroudi Department of Health Education, Health Sciences Research Center, School of Health, Mashhad University of Medical Sciences. Mashhad, Iran
Abstract:

Background and purpose: In a recent century, the amount of construction waste has increased significantly. Although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. Source reduction is the highest goal in the waste management hierarchy and is in priority. It also has economic benefits by reducing costs associated with transportation, disposal or recycling of wastes. The present study is aimed to identify activities generating the wastes in design, transportation and storage and procurement of building materials. Materials and Methods: This was questionnaire survey. A total of 94 professionals in the construction industry were attended in this study. To determine the validity and reliability of the instrument, content validity method and Cronbach’s alpha coefficient (0.79) were used. Data were analyzed using SPSS for Windows. Frequencies, percentage, mean and standard deviation were determined in this research. Results: The results showed that handling and storage have been chosen as the most causative factor of waste production in construction activity. Improper material storage was identified major factor in producing waste in handling and storage phase. Usage of low-quality material in design stage and material price changes in procurement were recognized as major causes of waste production in these stages. Conclusion: All studied phases in this research were identified as causative factors in producing of waste. Identifying causes of construction waste production will help us decide better how to control this sort of wastes.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

a study identifying causes of construction waste production and applying safety management on construction site

background and purpose: in a recent century, the amount of construction waste has increased significantly. although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. source reduction is the highest goal in the waste management hierarchy and is in priority. it also has economic benefits by reducing costs associated wi...

full text

construction and validation of a computerized adaptive translation test (a receptive based study)

آزمون انطباقی رایانه ای (cat) روشی نوین برای سنجش سطح علمی دانش آموزان می باشد. در حقیقت آزمون های رایانه ای با سرعت بالایی به سمت و سوی جایگزین عملی برای آزمون های کاغذی می روند (کینگزبری، هاوسر، 1993). مقاله حاضر به دنبال آزمون انطباقی رایانه ای برای ترجمه می باشد. بدین منظور دو پرسشنامه مشتمل بر 55 تست ترجمه میان 102 آزمودنی و 10 مدرس زبان انگلیسی پخش گردید. پرسشنامه اول میان 102 دانشجوی س...

Investigating the Impact of Safety Investment on Safety Culture in Construction Projects - Case Study of Power Plant Construction Projects

Background and aims: Construction industry is known as one of the most perilous industries in that it is involving the hazardous projects as well as the high manpower activities correlating with a high rate of work-related accidents. On the other hand, the high rate of accidents in the industry demanding a big budget for the damages; therefore, safety is strongly emphasized in the construction ...

full text

discursive motivation/demotivation construction: a case of iranian efl majors

بررسی نقش گفتمان در شکل گیری یا کاهش انگیزش فراگیران زبان خارجی موضوع تحقیق نسبتاً جدیدی است. از این رو، تحقیقات کمی در این زمینه وجود دارد. به منظور پر کردن این خلاء ، مطالعه کنونی به بررسی فرآیند گفتمان مدار شکل گیری یا کاهش انگیزش دانشجویان ایرانی زبان انگلیسی پرداخت. نخست، این مطالعه به صورت آزمایشی با 7 نفر (? دانشجوی پسر و 5 دختر) از دانشجویان سال دوم دوره ی کارشناسی زبان و ادبیات انگلیسی ...

A Study of Safety Management Using Working Area Information on Construction Site

The authors discussed on the development of a safety management support system to prevent construction site accidents using working area information. The past disasters on heavy equipment were evaluated to clarify the causes of the accidents, and the functions for support system to prevent collision were defined. The design of the system was proposed with working area from RFID technology that ...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 2  issue None

pages  49- 54

publication date 2014-09

By following a journal you will be notified via email when a new issue of this journal is published.

Keywords

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023