A Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem

Authors

Abstract:

Time, cost and quality are considered as the main components in managing each project. Previous researches have mainly focused on the time-cost trade-off problems. Recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. In time-cost-quality trade-off problems, each activity can be done in various execution modes and determination of these execution modes is seen as to minimize the project time and cost and maximize its quality .In this paper, three integer programming models are provided and one of the main objectives is optimized in each model by assigning the proper bound to other objectives. Following the non-dominated solutions obtained by solving models, and by means of hybrid approach of Fuzzy AHP strategy and VIKOR method regarded as multi-criteria decision making methods, the best possible alternative (from among non-dominated solutions) has been suggested.Fuzzy AHP method has been used to determine the importance rate of each objective. In this method linguistic variables were used which take us closer to reality. At the end, with applying these weights in VIKOR method, the best possible alternatives (among non-dominated solutions) were found. Using this hybrid approach can help managers, to a great extent, in selecting the appropriate solution so that maximum desirability is obtained due to the importance rate of the objective functions from the viewpoint of decision maker.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

a hybrid method based on fuzzy ahp and vikor for the discrete time-cost-quality trade-off problem

time, cost and quality are considered as the main components in managing each project. previous researches have mainly focused on the time-cost trade-off problems. recently quality is considered as the most important factor in project�s success, which is influenced by time acceleration that is the less time is spent the more success is gained. in time-cost-quality trade-off problems, each act...

full text

A hybrid genetic algorithm for the discrete time-cost trade-off problem

In this paper we present a hybrid strategy developed using genetic algorithms (GAs), simulated annealing (SA), and quantum simulated annealing techniques (QSA) for the discrete time–cost trade-off problem (DTCTP). In the hybrid algorithm (HA), SA is used to improve hill-climbing ability of GA. In addition to SA, the hybrid strategy includes QSA to achieve enhanced local search capability. The H...

full text

Multi Objective Particle Swarm Optimization for a Discrete Time, Cost and Quality Trade -off Problem

Time -Cost trade-off is a known and important problem in project management, because project managers should decide that whether they want to shorten the time of a project and tolerate its execution costs or minimize the costs and accept delays. It was recently suggested that the quality of a project should also be taken into considerations in this decision-making. In this paper, a meta-heurist...

full text

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

full text

A New Heuristic Algorithm for Time-cost Trade-off Problem Taking into Account Monetary Value

Time-cost trade-off is one of the most important subjects in project management and of interest to contractors. The goal of time-cost trade-off is sensivity analysis of project costs to changes in activity duration in order to obtain the best combination of activity duration decrease, in a way that the sum of project costs is minimized. In the heuristics presented in this area, time crashing is...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 9  issue 19

pages  105- 116

publication date 2016-11-01

By following a journal you will be notified via email when a new issue of this journal is published.

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023