A heuristic approach for multi-stage sequence-dependent group scheduling problems
author
Abstract:
We present several heuristic algorithms based on tabu search for solving the multi-stage sequence-dependent group scheduling (SDGS) problem by considering minimization of makespan as the criterion. As the problem is recognized to be strongly NP-hard, several meta (tabu) search-based solution algorithms are developed to efficiently solve industry-size problem instances. Also, two different initial solution generators are developed to aid in the application of the tabu search-based algorithms. A lower bounding technique based on relaxing the mathematical model for the original SDGS problem is applied to estimate the quality of the heuristic algorithms. To find the best heuristic algorithm, random test problems, ranging in size from small, medium, to large are created and solved by the heuristic algorithms. A detailed statistical experiment, based on nested split-plot design, is performed to find the best heuristic algorithm and the best initial solution gen-erator. The results of the experiment show that the tabu search-based algorithms can provide high quality so-lutions for the problems with an average percentage error of only 1.00%.
similar resources
A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times
This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...
full textA three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...
full textPareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...
full textA Meta-Heuristic Algorithm for Flexible Flow Shop Sequence Dependent Group Scheduling Problem
In this research, the flexible flow shop sequence dependent group scheduling problem (FFSDGS) with minimization of makespan as the criterion (FFm|fmls, Ssd|Cmax) is investigated. Since the problem is shown to be NP-hard, meta-heuristic algorithms are required to efficiently solve industry size problems. Thus, six different meta-heuristic algorithms based on tabu search (TS) are developed to eff...
full textA new heuristic approach to solve product mix problems in a multi-bottleneck system
Product mix problem (PMP) is one of the most important and complicated problems in production systems. Different approaches have been applied to solve this problem, among them, theory of constraints (TOC) has been widely considered since 1990s. This paper develops a distinguished algorithm to solve product mix prob-lems that is efficient both in single and multi-bottleneck problems. At first, t...
full texta fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times
this paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. for solving this multi-objective model, we develop a fuzzy multi-objective linear programming (fmolp) model. in this problem, a proposed fmolp method is applied with respect to the o...
full textMy Resources
Journal title
volume 4 issue 7
pages -
publication date 2007-05-01