A Bi-Objective Green Truck Routing and Scheduling Problem in a Cross Dock with the Learning Effect

Authors

Abstract:

We present a bi-objective model for a green truck scheduling and routing problem at a cross-docking system. This model determines three key decisions at the cross dock: (1) defining a sequence and schedule of inbound trucks at the receiving door, (2) specifying a sequence and a schedule of outbound trucks at the shipping door, and (3) determining the routes of the outbound truck while serving customers. The first objective function is related to responsiveness of the network that minimizes time window violations and the second objective function minimizes total fuel consumption of trucks in order to consider the environmental factor of the network. Also, a learning effect is considered in loading and unloading process times. To solve the bi-objective model, an archived multi-objective simulated annealing (AMOSA) is used and modified. Finally, a number of test problems are solved and the efficiency of the proposed AMOSA is compared with the e-constraint method.

Upgrade to premium to download articles

Sign up to access the full text

Already have an account?login

similar resources

Advances in Truck Scheduling at a Cross Dock Facility

In this paper the authors deal with the scheduling of inbound and outbound trucks to the available inbound and outbound doors at a cross dock facility. They assume that all trucks served at the facility need to meet several deadlines for deliveries and pick-ups and thus request a departure time window from the facility, penalizing the facility operator, on a unit of time basis, if that deadline...

full text

Multi-objective Differential Evolution for the Flow shop Scheduling Problem with a Modified Learning Effect

This paper proposes an effective multi-objective differential evolution algorithm (MDES) to solve a permutation flow shop scheduling problem (PFSSP) with modified Dejong's learning effect. The proposed algorithm combines the basic differential evolution (DE) with local search and borrows the selection operator from NSGA-II to improve the general performance.  First the problem is encoded with a...

full text

Truck scheduling problem in a cross-docking system with release time constraint

In a supply chain, cross-docking is one of the most innovative systems for ameliorating the operational performance at distribution centers. Cross-docking is a logistics strategy in which freight is unloaded from inbound trucks and (almost) directly loaded into outbound trucks, with little or no storage in between, thus no inventory remains at the distribution center. In this study, we consider...

full text

New Approaches in Metaheuristics to Solve the Truck Scheduling Problem in a Cross-docking Center

Nowadays, cross-docking is one of the main concepts in supply chain management in which products received to a distribution center by inbound trucks which are directly to lead into outbound trucks with a minimum handling and storage costs as the main cost of a cross-docking system. According to the literature, several metaheuristics and heuristics are attempted to solve this optimization model....

full text

Solving a bi-objective location routing problem by a NSGA-II combined with clustering approach: application in waste collection problem

It is observed that the separated design of location for depots and routing for servicing customers often reach a suboptimal solution. So, solving location and routing problem simultaneously could achieve better results. In this paper, waste collection problem is considered with regard to economic and societal objective functions. A non-dominated sorting genetic algorithm (NSGA-II) is used to l...

full text

A HYBRID GENETIC ALGORITHM FOR A BI-OBJECTIVE SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING CELL

 This paper considers a bi-objective scheduling problem in a flexible manufacturing cell (FMC) which minimizes the maximum completion time (i.e., makespan) and maximum tardiness simultaneously. A new mathematical model is considered to reflect all aspect of the manufacturing cell. This type of scheduling problem is known to be NP-hard. To cope with the complexity of such a hard problem, a genet...

full text

My Resources

Save resource for easier access later

Save to my library Already added to my library

{@ msg_add @}


Journal title

volume 8  issue None

pages  2- 14

publication date 2017-04

By following a journal you will be notified via email when a new issue of this journal is published.

Keywords

Hosted on Doprax cloud platform doprax.com

copyright © 2015-2023