A Bi-Objective Airport Gate Scheduling with Controllable Processing Times Using Harmony Search and NSGA-II Algorithms
Authors
Abstract:
Optimizing gate scheduling at airports is an old, but also a broad problem. The main purpose of this problem is to find an assignment for the flights arriving at and departing from an airport, while satisfying a set of constraints.A closer look at the literature in this research line shows thatin almost all studies airport gate processing time has been considered as a fix parameter. In this research, however, we investigate a more realistic situation in which airport gate processing time is a controllable. It is also assumed that the possible compression/expansion processing time of a flight can be continuously controlled, i.e. it can be any number in a given interval.Doing sohas some positive effectswhich lead to increasing the total performance at airports’ terminals. Depending on the situation, different objectives become important.. Therefore, a model which simultaneously (1) minimize the total cost of tardiness, earliness, delay andthe compression as well as the expansion costs of job processing time, and (2) minimize passengers overcrowding on gate is presented. In this study, we first propose a mixed-integer programming model for the formulated problem. Due to complexity of problem, two multi-objective meta-heuristic algorithms, i.e. multi-objective harmony search algorithm (MOHSA) and non-dominated sorting genetic algorithm II (NSGA-II) are applied in order to generate Pareto solutions. For calibrating the parameter of the algorithms, Taguchi method is used and three optimal levels of the algorithm’s performance are selected. The algorithms are tested with real-life data from Mehrabad International Airport for nine medium size test problems. The experimental results show that NSGA-II has better convergence near the true Pareto-optimal front as compared to MOHSA; however, MOHSA finds a better spread in the entire Pareto-optimal region.Finally, it is possible to apply some practical constraints into the model and also test them with even large real-life problems instances.
similar resources
Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
full textScheduling with Controllable Processing Times
In today's industrial world, demand nature is changing where the customers are looking for a high variety of products. In order to meet varying customer demands, the firms should be flexible enough to produce parts in an efficient way. The flexible manufacturing systems have emerged with the progress in manufacturing technology. A flexible manufacturing system (FMS) is a computer-controlled pro...
full textA Flexible Job Shop Scheduling Problem with Controllable Processing Times to Optimize Total Cost of Delay and Processing
In this paper, the flexible job shop scheduling problem with machine flexibility and controllable process times is studied. The main idea is that the processing times of operations may be controlled by consumptions of additional resources. The purpose of this paper to find the best trade-off between processing cost and delay cost in order to minimize the total costs. The proposed model, flexibl...
full textoptimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: nsga-ii and moica algorithms
the aim of a multi-mode resource-constrained project scheduling problem (mrcpsp) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). these goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
full textA bi-objective identical parallel machine scheduling problem with controllable processing times: a just-in-time approach
In this research, a bi-objective scheduling problem with controllable processing times on identical parallel machines is investigated. The direction of this paper is mainly motivated by the adoption of the just-in-time (JIT) philosophy on identical parallel machines in terms of bi-objective approach, where the job processing times are controllable. The aim of this study is to simultaneously min...
full textBuilding a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...
full textMy Resources
Journal title
volume 11 issue 1
pages 77- 90
publication date 2018-03-01
By following a journal you will be notified via email when a new issue of this journal is published.
Hosted on Doprax cloud platform doprax.com
copyright © 2015-2023