The Upgrade of Srrc Booster Extraction System

نویسندگان

  • J. P. Chiou
  • J. S. Chen
  • C. S. Fann
  • C. H. Ho
  • K. T. Hsu
  • S. Y. Hsu
  • C. S. Hwang
  • K. K. Lin
  • J. T. Sheu
  • T. S. Ueng
چکیده

It is planned to upgrade the SRRC booster from 1.3 GeV to 1.5 GeV for full energy injection into the storage ring before the end of 1999. Based on the technical specification and operation experience, it is concluded that some of the subsystem components need to be rebuilt, such as the magnet power supply systems and beam extraction elements. A review of the power supply system will be reported elsewhere. In this report, the brief review of the beam extraction process is given according to the 1.5 GeV parameters. The test result of a modified kicker magnet is presented.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Update of the Control System at Srrc

The control system of accelerator complex at SRRC work well since its dedication in 1993. Several major upgrade projects will finish in the early of next millennium to improve performance of the light source. Injector of SRRC will run in 1.5 GeV in 2000 with rejuvenated control system that has been integrated to main control system recently. Orbit feedback system is developed to improve orbit s...

متن کامل

Orbit Measurements at the Bessy Ii Booster in Preparation for Quasi-low Alpha Operation

Diagnostic refurbishments are ongoing at the booster synchrotron in preparation for the near future Variable pulse Storage Ring (VSR) project at BESSY II. Essential orbit measurements have been re-installed after almost two decades of latency. This diagnostic will help assess the effectiveness of possible upgrade scenarios such as quasi-low alpha operation and extraction optimization. The contr...

متن کامل

High Intensity Uranium Operation in Sis18

In order to follow the requirements of the ongoing experimental program at GSI and later on of the planned operation as a booster for the Facility for Antiproton and Ion Research FAIR, the intensity of uranium beams in SIS18 must be enhanced significantly. The goals are to increase the number of particles per cycle up to the space charge limit and to enhance the average intensity by an increase...

متن کامل

Spear3 Booster Rf System Upgrade: Performance Requirements and Evaluation of Resources*

The SPEAR2 accelerator system originally had 3 RF stations (2 for storage ring, 1 Booster) operating at 358.5 MHz. SPEAR3 now operates at 476.3 MHz with the PEPII type RF system, while the Booster RF frequency remains unchanged. For top-off operation, the Booster injects single 3.0 GeV electron bunches into SPEAR3 at 10 Hz every 5 minutes to replenish lost charge. Due to the frequency mismatch ...

متن کامل

Designing a model for upgrade the productivity of human resources in the National Iranian Oil Company

The purpose of this research is to design a model system for upgrade the productivity of human resources in the NIOC‌. This research, in terms of philosophical foundations of research in the paradigm of interpretiveness, from the perspective of purpose is part of exploratory research and the method of performing the work qualitatively; From the research strategy of data foundation theorizing wi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999