Rule-based scheduling in wafer fabrication with due date-based objectives

نویسندگان

  • Tsung-Che Chiang
  • Li-Chen Fu
چکیده

Wafer fabrication is a capital-intensive and highly complex manufacturing process. In the wafer fabrication facility (fab), wafers are grouped as a lot to go through repeated sequences of operations to build circuitry. Lot scheduling is an important task for manufacturers to improve production efficiency and meet customers’ requirements of on-time delivery. In this research we propose a dispatching rule for lot scheduling in wafer fabs, focusing on three due date-based objectives: on-time delivery rate, mean tardiness, and maximum tardiness. Although many dispatching rules have been proposed in the literature, they usually perform well in some objectives and bad in others. Our rule implements good principles in existing rules by means of (1) an urgency function for a single lot, (2) a priority index function considering total urgency of multiple waiting lots, (3) a due date extension procedure for dealing with tardy lots, and (4) a lot filtering procedure for selecting urgent lots. Simulation experiments are conducted using nine data sets of fabs. Six scenarios formed by two levels of load and three levels of due date tightness are tested for each fab. Performance verification of the proposed rule is achieved by comparing with nine benchmark rules. The experimental results show that the proposed rule outperforms the benchmark rules in terms of all concerned objective functions.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Due-Date Based Scheduling and Control Policies in a Multiproduct Semiconductor Wafer Fabrication Facility

This paper focuses on lot release control and scheduling problems in a semiconductor wafer fab producing multiple products that have different due dates and different process flows. For lot release control, it is necessary to determine the type of a wafer lot and the time to release wafers into the wafer fab, while it is necessary to determine sequences of processing waiting lots in front of wo...

متن کامل

Dynamic Scheduling Rule Selection for Semiconductor Wafer Fabrication

In this paper, we exploit the speed of an ordinal optimization (OO)-based simulation tool designed by Hsieh et al. to investigate dynamic selection of scheduling rules for semiconductor wafer fabrication (fab). Although a scheduling rule is a combination of loading wafer release and dispatching rules, this paper specifically focuses on dispatching when significant amount of wafers-in-process (W...

متن کامل

Simplification Methods for Accelerating Simulation-Based Real-Time Scheduling in a Semiconductor Wafer Fabrication Facility

This paper presents a real-time scheduling methodology in a semiconductor wafer fab that produces multiple product types with different due dates. In the suggested real-time scheduling method, lot scheduling rules and batch scheduling rules are selected from sets of candidate rules based on information obtained from discrete event simulation. Since a rule combination that gives the best perform...

متن کامل

Development of a Multiobjective Scheduler for Semiconductor Manufacturing

Scheduling of semiconductor wafer fabrication system is identified as a complex problem, involving multiple and conflicting objectives (meeting due dates and minimizing waiting time for instance) to satisfy. In this study, we propose an effective approach based an artificial neural network technique embedded in a multiobjective optimization loop for multi-decision scheduling problems in a semic...

متن کامل

Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory

Due-date performance is one of the most important production indexes for success utilized by wafer fabrication factories. Traditionally, the industry sets a specific due-date tightness level and a dispatching rule based on the total processing time, the production capacity, pre-defined order release criteria and historical data, to ensure deliveries are made on-time. However, such policies typi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 39  شماره 

صفحات  -

تاریخ انتشار 2012