Beam Observations with Electron Cloud in the Cern Ps & Sps Complex

نویسندگان

  • G. Arduini
  • T. Bohl
  • K. Cornelis
  • W. Höfle
  • E. Métral
  • F. Zimmermann
چکیده

With the start of the machine studies to characterize the behaviour of the LHC beam in the SPS in 1999, it became evident that electron multipacting was occurring in the SPS vacuum chambers in the presence of this beam. Multipacting induces dramatic pressure increases preventing stable operation, it limits the performance of beam instrumentation and high voltage electrostatic devices (e.g. electrostatic septa) and it induces strong transverse instabilities leading to emittance dilution. Although an increase of the threshold bunch population for multipacting can be obtained by beam conditioning (”scrubbing”), multipacting persists in the arcs for the nominal LHC bunch population and electron cloud instabilities remain an issue for the LHC beam. A programme of studies has been launched since 1999 to study the electron cloud build-up and related instabilities in the SPS and in the PS for the LHC and fixed target beams. The experimental tools and analysis developed so far are presented together with the results of the observations. The countermeasures applied in the PS Complex & SPS against the electron cloud instability are also briefly discussed. INTRODUCTION The main beam parameters for the LHC and fixed target beams are listed in Tables 1 and 2. Table 1: The LHC beam in CERN PS and SPS [1] PS@extr. SPS@inj. SPS@extr Momentum [GeV/c] 26 26 450 Revolution period [μs] 2.1 23.07 23.05 Tunes (H/V) 6.25 26.185/26.13 Gamma transition 6.1 22.8 Max. n. of batches 1 4 n. bunches/batch 72 72 Nominal Nb [10] 1.15 1.15 Bunch spacing [ns] 24.97 24.97 24.95 Full bunch length [ns] 4-16 4 <2 Batch spacing [ns] 224.7 224.6 r.m.s. εH,V [μm] 3 3 3.5 εL [eV s] 0.35 0.35 <0.8 * The bunch length is reduced from 16 to 4 ns by a non-adiabatic bunch compression prior to extraction. This process takes approximately 100 turns (~200 μs) Table 2: The Fixed Target beam in CERN SPS SPS@inj. SPS@extr Momentum [GeV/c] 14 400 Revolution period [μs] 23.11 23.05 Tunes (H/V) 26.62/26.58 Gamma transition 23.2 Max. n. of batches 2 n. bunches/batch 2100 Nominal Nb [10] 0.1 – 0.2 Bunch spacing [ns] 5.00 4.99 Full bunch length [ns] 4 <3 Batch spacing [ns] 105

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

European Organization for Nuclear Research Cern Sl Division

See the introduction in next page. EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN SL DIVISION 2 Energy Spectrum Measurement of the Multipacting Electrons in the SPS. Analysis of the Possible Utilisation of the BGIP Monitor ------------------------------------------------------------------------------------------------------------------------Mauro Pivi CERN – LHC Division – VAC Group Alessandro...

متن کامل

Electron cloud buildup and instability: Numerical simulations for the CERN Proton Synchrotron

Gas ionization and electron multiplication due to the secondary-emission process on the inner side of the beam pipe may induce the buildup of an electron cloud, which can significantly degrade the performance of rings operating with closely spaced proton or positron bunches. The undesired electron cloud causes pressure rise and beam instability when the parameters are pushed above certain thres...

متن کامل

Electron Cloud in the Sps Summary

• The first talk by F. Ruggiero [1] gave a short introduction to some key concepts relevant to the discussion of electron cloud effects and their implications for PS, SPS and LHC operation. • This was followed by a talk given by W. Höfle [2] who reported about strong perturbations on pick-up signals of the SPS transverse feedback system (damper), observed with LHC type beams and attributed to t...

متن کامل

EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics THE ELECTRON CLOUD INSTABILITY OF THE LHC BEAM IN THE CERN SPS

The electron cloud induced by the LHC beam in the SPS occurs mainly in the dipoles and it is responsible for strong transverse instabilities. In the horizontal plane a coupled bunch mode instability develops in a few tens of turns at injection. Tune shift measurements, mode number and phase space analyses have been performed at different energies and provide information about the electron cloud...

متن کامل

Electron Cloud Clearing - Electron Cloud Effects and Technological Consequences

This report contains the Proceedings of the joint CARE-HHH-APD, CARE ELAN, and EUROTEV-WP3 Mini-Workshop on ‘Electron Cloud Clearing Electron Cloud and Technological Consequences’, “ECL2”, held at CERN in Geneva, Switzerland, 1-2 March 2007). The ECL2 workshop explored novel technological remedies against electron-cloud formation in an accelerator beam pipe. A primary motivation for the worksho...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004