Modeling and Worker Motivation in JIT Production Systems
نویسندگان
چکیده
This paper concerns the modeling of low inventory lines. Currently, most models assume that processing times are independent. We consider the differences in behavior of workers in lowand high-inventory production lines. Using a laboratory experiment we show that workers speed up when they are the cause of idle time on the line. This means that processing time distributions are not independent of the size of the buffer, of the processing speed of co-workers, or of the amount of inventory in the system. We show that the direction of these effects is predictable and that the magnitude is significant. In particular, there is less idle time and higher output than would be predicted using assumptions of independence. In this experiment the effect completely canceled productivity loss due to blocking and starving. This work is important in understanding both the motivation of workers in low-inventory systems and the implications of models of manufacturing flow lines. (JIT; Serial Production Lines; Independence Assumption; Job Design)
منابع مشابه
System model of production inventory control
The primary consequence of just-in-time (JIT) production is reduction of inventory. The associated benefit is (a) improved cashflow due to less financial resource tied up in inventory, and (b) less storage space required hence more productive plant area. Coupled with lean production and total quality management (TQM), it may also be possible to (c) improve worker productivity, (d) improve produ...
متن کاملAnalysis of interactions among the barriers to JIT production: interpretive structural modelling approach
‘Survival of the fittest’ is the reality in modern global competition. Organizations around the globe are adopting or willing to embrace just-in-time (JIT) production to reinforce the competitiveness. Even though JIT is the most powerful inventory management methodologies it is not free from barriers. Barriers derail the implementation of JIT production system. One of the most significant tasks...
متن کاملComing Full Circle: How Health Worker Motivation and Performance in Results-Based Financing Arrangements Hinges on Strong and Adaptive Health Systems
Background This paper presents findings from a study which sought to understand why health workers working under the results-based financing (RBF) arrangements in Zimbabwe reported being satisfied with the improvements in working conditions and compensation, but paradoxically reported lower motivation levels compared to those not working under RBF arrangements. Methods...
متن کاملGenetic and Memetic Algorithms for Sequencing a New JIT Mixed-Model Assembly Line
This paper presents a new mathematical programming model for the bi-criteria mixed-model assembly line balancing problem in a just-in-time (JIT) production system. There is a set of criteria to judge sequences of the product mix in terms of the effective utilization of the system. The primary goal of this model is to minimize the setup cost and the stoppage assembly line cost, simultaneously. B...
متن کاملDesign of practical optimum JIT systems by integration of computer simulation and analysis of variance
This study introduces a framework for re-design of manufacturing systems into practical optimum just-in-time systems by integration of computer simulation and analysis of variance. The conventional JIT approach is mostly applicable to static production systems and the dynamic production systems require a more practical integrated JIT approach. In addition, the re-design of existing dynamic syst...
متن کامل