The L-shaped method allows to solve large scale stochastic problems that cannot be solved directly. Each major iteration method solves all scenario subproblems and generate a single optimality or feasibility cut to the master problem by aggregating all the cuts obtained from the subproblems. This causes an ”information loss” and results in a large number of major iterations. The multicut L-shaped method of Birge and Louveaux (1988) allows to add all cuts at once to the master problem. This potentially reduces the number of major iterations but increase the number of decision variables in the master problem drastically (each cut requires one new variable). Also the number of constraints added each iteration is huge. These facts make multicut method useless for practical application. This project involves making an extension to make partial aggregation of the cuts instead of full aggregation (as in original L-shaped) or no aggregation (as multicut L-shaped does). The main idea is to find a compromise between the master problem size and the number of major iteration that minimizes total runtime.
منابع مشابه
On Adaptive Multicut Aggregation for Two-Stage Stochastic Linear Programs with Recourse
Outer linearization methods for two-stage stochastic linear programs with recourse, such as the L-shaped algorithm, generally apply a single optimality cut on the nonlinear objective at each major iteration, while the multicut version of the algorithm allows for several cuts to be placed at once. In general, the Lshaped algorithm tends to have more major iterations than the multicut algorithm. ...
متن کاملAdaptive multicut aggregation for two-stage stochastic linear programs with recourse
Outer linearization methods for two-stage stochastic linear programs with recourse, such as the L-shaped algorithm, generally apply a single optimality cut on the nonlinear objective at each major iteration, while the multicut version of the algorithm allows for several cuts to be placed at once. In general, the Lshaped algorithm tends to have more major iterations than the multicut algorithm. ...
متن کاملA multicut L-shaped based algorithm to solve a stochastic programming model for the mobile facility routing and scheduling problem
This paper considers the mobile facility routing and scheduling problem with stochastic demand (MFRSPSD). The MFRSPSD simultaneously determines the route and schedule of a fleet of mobile facilities which serve customers with uncertain demand to minimize the total cost generated during the planning horizon. The problem is formulated as a two-stage stochastic programming model, in which the firs...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملThe Stochastic Generalized Assignment Problem with Coordination Constraints
This work introduces the stochastic generalized assignment problem with coordination (SGAPC). The SGAP-C is a novel and challenging variant of stochastic generalized assignment problems that models many-to-many assignments with varying levels of complexity, and studies the benefits of collaboration and coordination. The work is motivated by a disaster relief setting where relief organizations c...