A Resource-oriented Planner for Integrated Shop Level Material Processing and Material Handling Operations

نویسندگان

  • Jay W. Steele
  • Richard A. Wysk
  • Sanjay B. Joshi
  • Rajeev Sharma
چکیده

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Operations Planner for Integrated Shop Floor Material Processing and Material Handling Operations

Planning that incorporates critical resource and part constraints due to manufacturing processing as well as material handling tolerance and kinematic requirements has not been reported in the existing literature. By integrating these manufacturing resource and part constraints using object-oriented design, our new operations planner creates immediately executable manufacturing plans for flexib...

متن کامل

A Comprehensive Mathematical Model for the Design of a Dynamic Cellular Manufacturing System Integrated with Production Planning and Several Manufacturing Attributes

    Dynamic cellular manufacturing systems,   Mixed-integer non-linear programming,   Production planning, Manufacturing attributes   This paper presents a novel mixed-integer non-linear programming model for the design of a dynamic cellular manufacturing system (DCMS) based on production planning (PP) decisions and several manufacturing attributes. Such an integrated DCMS model with an extensi...

متن کامل

Integrated Scheduling of Manufacturing Operations and Material Handling Tasks in the Job Shops: a Network Model

Material handling tasks in the job shops have to be coordinated with manufacturing operations in order to efficiently utilize the production resources and to reduce the accumulation of work-in-process inventory. This paper extends the traditional job shop scheduling problem by incorporating the scheduling of the material handling tasks. It provides a generic definition and a network model for t...

متن کامل

Integrated production and material handling scheduling using mathematical programming and constraint programming

In this article, we optimally solve an integrated production and material handling scheduling problem. Traditionally, scheduling problems consider machines as the only constraining resource. This is however no longer true as material handling equipment are becoming more and more valuable resources requiring important investments. Their operations should be optimized and above all synchronized w...

متن کامل

Integrated Scheduling of Material Handling and Manufacturing Activities for Just-In-Time Production of Complex Assemblies

This paper considers the simultaneous scheduling of material handling transporters (such as Automatic Guided Vehicles or AGVs) and manufacturing equipment (such as machines and workcenters) in the production of complex assembled products. Given the shipping schedule for the end-items, the objective of the integrated problem is to minimize the cumulative lead time of the overall production sched...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002