An Improved Immune Algorithms for Solving Flexible Manufacturing System Distributed Production Scheduling Problem Subjects to Machine Maintenance
نویسندگان
چکیده
Competitiveness and rapid expansion of flexible manufacturing system (FMS) as one of the industrial alternatives has attracted many practitioners’ and academicians’ interest. Recent globalization events have further encouraged FMS development into distributed, self-reliant units of production center. The flexible manufacturing system in distributed system (FMSDS) considers multi-factory environments, where jobs are processed by a system of FMSs. FMSDS problems deal with the allocation of jobs to factories, independent assignment of job operation to the machines, and operations sequencing on the machine. Additionally, in many previous studies, impact of maintenance as one of the core parts of production scheduling has been neglected. This significantly affects the overall performance of the production scheduling. As such, maintenance has been considered in this paper as part of the production scheduling. The objective of this paper is to minimize the global makespan over all the factories. This paper proposes an Improved Immune Algorithm (IIA) to solve the FMSDS problem. Antibody encoding adoption explicitly represents the information of factory, job, and maintenance, whilst a greedy decoding procedure exploits flexibility and determines the job routing. Rather than s traditional mutation operator, an improvised mutation operator is used to improve the solutions by refining the most promising individuals of each generation. The proposed approach has been compared with other algorithms and obtained satisfactory results, where the algorithm performance has been tested with several parameter tunings. Keywords—flexible manufacturing system, distributed system, machine maintenance, immune algorithm.
منابع مشابه
Improved Immune Algorithm for Optimizing Distributed Production Scheduling Problem in Flexible Manufacturing System Subject to Machine Maintenance
Competitiveness and rapid expansion of flexible manufacturing system (FMS), as one of the industrial alternatives, has attracted the attention of many practitioners and academicians. Globalization has further encouraged FMS development into distributed, self-reliant units of production center. Flexible manufacturing system in distributed system (FMSDS) considers multi-factory environments, wher...
متن کاملOptimality of the flexible job shop scheduling system based on Gravitational Search Algorithm
The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...
متن کاملImproved teaching–learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems
Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...
متن کاملOptimality of the flexible job shop scheduling system based on Gravitational Search Algorithm
The Flexible Job Shop Scheduling Problem (FJSP) is one of the most general and difficult of all traditional scheduling problems. The Flexible Job Shop Problem (FJSP) is an extension of the classical job shop scheduling problem which allows an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machine...
متن کاملMathematical Modeling for a Flexible Manufacturing Scheduling Problem in an Intelligent Transportation System
This paper presents a new mathematical model for a production system through a scheduling problem considering a material handling system as an intelligent transportation system by automated guided vehicles (AGVs). The traditional systems cannot respond to the changes and customer’s demands and for this reason, a flexible production system is used. Therefore, for this purpose, automated transpor...
متن کامل