Batch scheduling of step deteriorating jobs

نویسندگان

  • M. S. Barketau
  • T. C. Edwin Cheng
  • C. T. Ng
  • Vladimir Kotov
  • Mikhail Y. Kovalyov
چکیده

In this paper we consider the problem of scheduling n jobs on a single machine, where the jobs are processed in batches and the processing time of each job is a step function depending on its waiting time, which is the time between the start of the processing of the batch to which the job belongs and the start of the processing of the job. For job i, if its waiting time is less than a given threshold value D, then it requires a basic processing time ai; otherwise, it requires an extended processing time ai + bi. The objective is to minimize the completion time of the last job. We first show that the problem is NP-hard in the strong sense even if all bi are equal, it is NP-hard even if bi = ai for all i, and it is non-approximable in polynomial time with a constant performance guarantee ∆ < 3/2 unless P = NP . We then present O(n log n) and O(n3F−1 log n/F F ) algorithms for the case where all ai are equal and for the case where there are F, F ≥ 2, distinct values of ai, respectively. We further propose an O(n log n) approximation algorithm with a performance guarantee ∆ ≤ 1 + bm 2 c/m∗ ≤ 3/2 for the general problem, where m∗ is the number of batches in an optimal schedule. All the above results apply or can be easily modified for the corresponding open-end bin packing problem.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

A Hybrid Approach for Fuzzy Just-In-Time Flow Shop Scheduling with Limited Buffers and Deteriorating Jobs

This paper investigates the problem of just-in-time permutation flow shop scheduling with limited buffers and linear job deterioration in an uncertain environment. The fuzzy set theory is applied to describe this situation. A novel mixed-integer nonlinear program is presented to minimize the weighted sum of fuzzy earliness and tardiness penalties. Due to the computational complexities, the prop...

متن کامل

GENETIC AND TABU SEARCH ALGORITHMS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SET-UP TIMES AND DETERIORATING JOBS

 This paper introduces the effects of job deterioration and sequence dependent set- up time in a single machine scheduling problem. The considered optimization criterion is the minimization of the makespan (Cmax). For this purpose, after formulating the mathematical model, genetic and tabu search algorithms were developed for the problem. Since population diversity is a very important issue in ...

متن کامل

Design of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System

This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizin...

متن کامل

Parallel Batch Scheduling of Deteriorating Jobs with Release Dates and Rejection

We consider the unbounded parallel batch scheduling with deterioration, release dates, and rejection. Each job is either accepted and processed on a single batching machine, or rejected by paying penalties. The processing time of a job is a simple linear increasing function of its starting time. The objective is to minimize the sum of the makespan of the accepted jobs and the total penalty of t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • J. Scheduling

دوره 11  شماره 

صفحات  -

تاریخ انتشار 2008