Multi-stage Stochastic Programming Models in Production Planning

نویسندگان

  • Kai Huang
  • Shabbir Ahmed
  • Ozlem Ergun
  • Joel Sokol
  • Samer Takriti
چکیده

To my dear wife Ying Luo, my dad Naiyu Huang, my mom Yan Li, and my whole family, your love is always the source of my strength. iii ACKNOWLEDGEMENTS First, I want to thank my advisor Dr. Shabbir Ahmed, without whose guidance I could not have finished this exciting journey of discovery and exploration. He taught me how to select a valuable research topic, to conduct high quality research, and to properly present that research. Also my friend, he is always willing to listen to me and to offer advice in every aspect of life. Second, I want to thank Dr. Marc Goetschalckx and Dr. Leon McGinnis, who taught me how to think like an industrial engineer. Third, I thank all my committee members whose patient and considerate advice provided significant insights for this research. Fourth, I thank all the professors in Georgia Institute of Technology who taught me in the past five years. Their high quality courses will always be my treasure. Finally, I thank all my colleagues. I have had great pleasure in working with them, learning from them, and living with them.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty

In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, t...

متن کامل

A multi-stage stochastic programming for condition-based maintenance with proportional hazards model

Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...

متن کامل

Multi-stage Stochastic Programming Models in Production Planning

Production planning is a key area of operations management. An important methodology for production planning is mathematical programming. Traditional mathematical programming models for production planning are deterministic, and cannot provide robust production plans in the presence of uncertainty. As such, deterministic planning models may yield unsatisfactory decisions. Stochastic programming...

متن کامل

A Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning

The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...

متن کامل

A robust multi-objective global supplier selection model under currency fluctuation and price discount

Robust supplier selection problem, in a scenario-based approach has been proposed, when the demand and exchange rates are subject to uncertainties. First, a deterministic multi-objective mixed integer linear programming is developed; then, the robust counterpart of the proposed mixed integer linear programming is presented using the recent extension in robust optimization theory. We discuss dec...

متن کامل

Dynamic Multi Period Production Planning Problem with Semi Markovian Variable Cost (TECHNICAL NOTE)

This paper develops a method for solving the single product multi-period production-planning problem, in which the production and the inventory costs of each period arc concave and backlogging is not permitted. It is also assumed that the unit variable cost of the production evolves according to a continuous time Markov process. We prove that this production-planning problem can be Stated as a ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005