Optimal Sizing of Low Head Hydropower Plant- A Case Study of Hydropower Project at Head of UCC (Lower) at Bambanwala
نویسندگان
چکیده
Pakistan is facing serious shortfall of electricity for few decades. Small hydropower projects can alleviate the worsening situation. The sizing of a low head hydropower plant plays a vital role in establishing the feasibility of the project. The plant needs to be optimized for energy produced, efficiencies of the plant components, number of units and its financial/economic parameters. This paper presents a review on the methodologies by which low head hydropower plants are being optimized to get maximum energy output with minimal cost. The study of various researchers is being presented regarding optimal sizing and selection of small hydropower plant components. A brief summary of low head hydropower schemes in Punjab, Pakistan is also presented herein, which are presently under construction. Moreover based upon literature review and methodology adopted for the hydropower schemes in construction stage, using graphical optimization technique, optimal sizing for power site at Upper Chenab Canal Lower (UCCL) at Bambanwala is also presented. In this study a new parameter; inverse incremental energy is employed for selecting optimum flow. Two turbines (Kaplan, pit type) with combined capacity of 3.58MW are found to be optimal for the case study site.
منابع مشابه
Integrated Evaluation of Increasing Irrigation Efficiency and Reducing Discharge Impacts on Hydropower Generation of Basin Water Resources System(Case Study: Dez Irrigation Network – Dez Dam)
World electricity production today is heavily dependent on water resources. Studies have shown that global warming and climate changes will have significant impacts on available water resources to produce hydroelectric power. Considering that the reservoir dam in the catchment area of Dez is simultaneously a producer of hydropower and supplier of water needed for agricultural land, the aim of t...
متن کاملWater level control system for a low-head run-of-river variable speed small hydropower plant
This paper presents part of the work carried out within the framework of a research project entitled Application of variable speed and intelligent control technologies to hydropower generation. Specifically, it is focused on the activities performed in order to achieve one of the main objectives of the project: the design of a water level control system for a low-head run-of-river variable spee...
متن کاملPreliminary Site Selection of Pumped Storage Hydropower Plants - A GIS-based approach
The first stage in development and design of Pumped Storage Hydropower Plants (PSHP) is finding the optimum location. This paper presents a methodology for preliminary site selection of PSHP with the help of geospatial data analysis in a Geographic Information System (GIS) environment. The conventional method of PSHP site selection has certain limitations and is not cost and time effective. The...
متن کاملProject Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)
Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...
متن کاملStability Analysis of a Run-of-River Diversion Hydropower Plant with Surge Tank and Spillway in the Head Pond
Run-of-river hydropower plants usually lack significant storage capacity; therefore, the more adequate control strategy would consist of keeping a constant water level at the intake pond in order to harness the maximum amount of energy from the river flow or to reduce the surface flooded in the head pond. In this paper, a standard PI control system of a run-of-river diversion hydropower plant w...
متن کامل