Production planning problem with sequence dependent setups as a bilevel programming problem

نویسندگان

  • Zrinka Lukac
  • Kristina Soric
  • Visnja Vojvodic Rosenzweig
چکیده

Each of n products is to be processed on two machines in order to satisfy known demands in each of T periods. Only one product can be processed on each machine at any given time. Each switch from one item to another requires sequence dependent setup time. The objective is to minimize the total setup time and the sum of the costs of production, storage and setup. We consider the problem as a bilevel mixed 0-1 integer programming problem. The objective of the leader is to assign the products to the machines in order to minimize the total sequence dependent setup time, while the objective of the follower is to minimize the production, storage and setup cost of the machine. We develop a heuristics based on tabu search for solving the problem. At the end, some computational results are presented.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups

  The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic me...

متن کامل

A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times

Many authors have examined lot sizing, scheduling and sequence of multi-product flow shops, but most of them have assumed that set up times are independent of sequence. Whereas dependence of set up times to sequence is more common in practice. Hence, in this paper, we examine the discussed problem with hypothesis of dependence of set up times to sequence and cyclic schedule policy in basic peri...

متن کامل

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

One Heuristics for Production Planning Problem with Sequence Dependent Setups

Each of n items (products) is to be processed on two, capacity limited machines in order to satisfy known demands in each of T periods. Only one item can be processed on each machine at any given time and period. Each switch from one item to another requires sequence dependent setup time. The object is to minimize the sum of the costs of production, storage and setup. We define a quadratic mixe...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 187  شماره 

صفحات  -

تاریخ انتشار 2008