Evaluation of the potential bene"ts of lot streaming in #ow-shop systems
نویسندگان
چکیده
Lot streaming is the process of splitting a production lot into sublots, and then scheduling the sublots in overlapping fashion on the machines, in order to improve the overall performance of the production system. Simulation-based and industry-based reports have con"rmed that substantial bene"ts are possible via lot streaming. In this paper, we present, for the "rst time, analytical results pertaining to the potential bene"ts of lot streaming in #ow-shop systems. The results are developed using three common performance measures. These measures are (a) makespan (i.e., the total completion time of all the lots), (b) mean #ow time, and (c) average WIP level. For each, an expression of the ratio of the measure under lot streaming to the measure without lot streaming is developed. These expressions can be used to evaluate the bene"ts of lot streaming under certain operating conditions. It is further shown that, in special extreme cases, these expressions purely depend upon the problem parameters (i.e., the number of machines, the number of lots, the lot-sizes, etc.) ( 2000 Elsevier Science B.V. All rights reserved.
منابع مشابه
Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage
In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...
متن کاملCustomer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملCritical Path Method for Flexible Job Shop Scheduling Problem with Preemption
This paper addressed a Flexible Job shop Scheduling Problem (FJSP) with the objective of minimization of maximum completion time (Cmax) which job splitting or lot streaming is allowed. Lot streaming is an important technique that has been used widely to reduce completion time of a production system. Due to the complexity of the problem; exact optimization techniques such as branch and bound alg...
متن کاملLot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors
This paper considers a no-wait multi product flowshop scheduling problem with sequence dependent setup times. Lot streaming divide the lots of products into portions called sublots in order to reduce the lead times and work-in-process, and increase the machine utilization rates. The objective is to minimize the makespan. To clarify the system, mathematical model of the problem is presented. Sin...
متن کاملA Heuristic Method for Multi-product Variable Lot Streaming in a Flow Shop
The multi-product variable lot streaming (MPVLS) in a flow shop is to determine product sequence, to determine the machines to reallocate lot streaming for each product in the sequence, and to determine lot streaming for each machine, in order to minimize makespan for producing all products. In this paper, MPVLS is decomposed into three sub-problems: product sequence determination, lot streamin...
متن کامل