A heuristic approach to railway track maintenance scheduling
نویسندگان
چکیده
Travelling safely and comfortably on high speed railway lines requires excellent conditions of the whole railway infrastructure in general and of the railway track geometry in particular. The maintenance process required to achieve such excellent conditions is largely complex and expensive, demanding an increased amount of both human and technical resources. In this framework, an optimal scheduling of maintenance interventions is an issue of increased relevance. In this work a method for optimization of the tamping scheduling is presented. It is based on a heuristic algorithm, which finds a very detailed tamping schedule where each planned intervention is fully specified. The algorithm tries to maximize an objective function, which is a quantitative expression of the maintenance process’s objectives defined by the railway company. It first finds an upper bound for the objective function value, and then returns the best feasible solution found. The method is validated by means of a case study based on real data of the 240 km track of a French high speed TGV line. The results presented show that the value of the best solution found is very near to the upper bound (the difference is smaller than 1%), with a calculation time of under 1 second using a standard computer, so we think the heuristic has a great performance potential.
منابع مشابه
A discrete-event optimization framework for mixed-speed train timetabling problem
Railway scheduling is a complex task of rail operators that involves the generation of a conflict-free train timetable. This paper presents a discrete-event simulation-based optimization approach for solving the train timetabling problem to minimize total weighted unplanned stop time in a hybrid single and double track railway networks. The designed simulation model is used as a platform for ge...
متن کاملStrategic Gang Scheduling for Railroad Maintenance
We address the railway track maintenance scheduling problem. The problem stems from the significant percentage of the annual budget invested by the railway industry for maintaining its railway tracks. The process requires consideration of human resource allocations (gangs), as well as effective logistics for equipment movement and routing around the rail network under time window constraints. W...
متن کاملHeuristic based track maintenance scheduling optimisation
The maintenance of railway track is highly relevant for the service quality and safety. This task demands huge technical and human resources. Therefore an optimal deployment of the available resources is crusial for the cost-effectiveness of railway operation. Furthermore, the track geometry maintenance activities need to be planned up to two years in advance. For this reason the French railway...
متن کاملFlow shop Scheduling Problem with Maintenance Coordination: a New Approach
This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...
متن کاملDevelopment of a Finite Element Methodology for Flexible Track Models in Railway Dynamics Applications
The dynamic analysis of railway vehicles involves the construction of three independent models: the vehicle model; the track model; and the wheel-rail contact model. In this work, a multibody formulation with Cartesian coordinates is used to describe the kinematic structure of the rigid bodies and joints that constitute the vehicle model. A methodology is also proposed in order to create detail...
متن کامل