International Project Risk Management for Nuclear Power Plant (NPP) Construction: Featuring Comparative Analysis with Fossil and Gas Power Plants

نویسندگان

  • Min Kim
  • Ikhaeng Lee
  • Youngsoo Jung
چکیده

The concern of risk management has continuously increased in international construction projects. International projects have a high level of risk and complexity, which results in greater possibilities of cost overruns and schedule conflicts when compared with local projects. Therefore, the goal of risk management is to improve project performance by systematically identifying and assessing project risks, developing strategies to reduce or avoid risks and to maximize opportunities. However, there have been very limited studies in systemized risk management methods due to the unstructured nature of the risk items and knowledge, especially for nuclear power plant projects. In order to address this issue, this paper proposes a standardized risk management methodology for nuclear power plant (NPP) construction with a capability of comparing distinctive risk characteristics among fossil, gas, and nuclear power plants. The proposed methodology includes standard risk classifications and structured risk evaluation techniques in terms of likelihood, impact, and weightings for different types of power plants. It also defines risk packages and risk paths for effective manipulation in a structured manner. The proposed methodology, variables, and initial values were identified by an extensive literature review and expert interviews. Finally, a customizable prototype of risk management system in power-plant construction projects was proposed in order to examine the viability. Implications of this paper reveal that the nuclear power plant has much higher risks in all areas when compared with fossil and gas power plants. It was stressed, throughout this study, that the risk factors of nuclear power plant construction need to be continuously monitored and evaluated in order to explore sustainable nuclear power plants.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method

Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...

متن کامل

Advanced Construction Methods for New Nuclear Power Plants - NTR2009 Supplement

Relative to coal fired and natural gas fired power plants, nuclear power plants are more expensive to build but less expensive to run. This annex describes advanced construction methods to reduce nuclear power's construction costs, mainly by shortening the time needed to build a plant. Each of the methods described below has been used in one or more of the projects listed in Table IV-1. None is...

متن کامل

رقابت پذیری اقتصادی نیروگاههای هسته ای در ایران

In this paper, competitiveness of nuclear power plants in comparison with fossil fuel power plants in Iran has been evaluated. For the first step, different factors affecting economic competitiveness of thermal power plants such as Investment, O&M and Fuel Costs, Discount Rate and Environmental Impacts has been studied. To analyse the effect of each parameter, screening curve method has been us...

متن کامل

Environmental-economic evaluation of sugar cane bagasse gasification power plants versus combined-cycle gas power plants

Approximately 2.4 million tons of bagasse are produced each year in Iran, most of which are currently treated as waste adding to serious environmental concerns. Application of bagasse for energy production is a sustainable solution to supply the required energy within the sugar refineries and export the surplus electricity to the grid. Currently, the energy demand in Iranian sugar mills is main...

متن کامل

Risk management: A tool for improving nuclear power plant performance

FOREWORD This technical document on risk management as a tool for improving nuclear power plant (NPP) operations is part of an ongoing project on management of NPP operations in a competitive environment. The overall objective of this project is to assist the management of operating organizations and NPPs in identifying and implementing appropriate measures to remain competitive in a rapidly ch...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017