A Comparative Study of Exponential Time between Events Charts
نویسندگان
چکیده
Control charts based on time between events (TBE) data have been shown to be useful for monitoring production or failure processes where defect or failure occurrence can be recorded over time. One type of TBE chart is set up with probability control limits, e.g. the Cumulative Quantity Control (CQC) chart and its extension CQC-r chart, which monitors the quantity inspected until the occurrence of a fixed number of defects (r). Another type of TBE chart studied in the literature is to apply the CUSUM and EWMA methods to TBE data directly. In this paper, some exponential TBE charts are compared based on their Average Time to Signal (ATS) performance. Different in-control ATS values are used in order to evaluate its effect on the performance of the TBE charts. Based on the comparison analysis, some recommendations are made as guidelines for employing a proper chart under different situations.
منابع مشابه
Improved Phase I Control Charts for Monitoring Times Between Events
In many situations, the times between certain events are observed and monitored instead of the number of events particularly when the events occur rarely. In this case, it is common to assume that the times between events follow an exponential distribution. Control charts are one of the main tools of statistical process control and monitoring. Control charts are used in phase I to assist operat...
متن کاملA new adaptive exponential smoothing method for non-stationary time series with level shifts
Simple exponential smoothing (SES) methods are the most commonly used methods in forecasting and time series analysis. However, they are generally insensitive to non-stationary structural events such as level shifts, ramp shifts, and spikes or impulses. Similar to that of outliers in stationary time series, these non-stationary events will lead to increased level of errors in the forecasting pr...
متن کاملControl Charts Based on the Exponential Distribution: Adapting Runs Rules for the t Chart
This article may be used for research, teaching, and private study purposes. Any substantial or systematic reproduction, redistribution, reselling, loan, sub-licensing, systematic supply, or distribution in any form to anyone is expressly forbidden. The publisher does not give any warranty express or implied or make any representation that the contents will be complete or accurate or up to date...
متن کاملSynthetic-Type Control Charts for Time-Between-Events Monitoring
This paper proposes three synthetic-type control charts to monitor the mean time-between-events of a homogenous Poisson process. The first proposed chart combines an Erlang (cumulative time between events, Tr ) chart and a conforming run length (CRL) chart, denoted as Synth-Tr chart. The second proposed chart combines an exponential (or T) chart and a group conforming run length (GCRL) chart, d...
متن کاملExponential CUSUM Charts with Estimated Control Limits
Exponential CUSUM charts are used in monitoring the occurrence rate of rare events because the interarrival times of events for homogeneous Poisson processes are independent and identically distributed exponential random variables. In these applications, it is assumed that the exponential parameter, i.e. the mean, is known or has been accurately estimated. However, in practice, the in-control m...
متن کامل