2001: Constrained Optimization over Discrete Sets via Spsa with Application to Non-separable Resource Allocation
نویسندگان
چکیده
This paper presents a version of the Simultaneous Perturbation Stochastic Approximation (SPSA) algorithm for optimizing non-separable functions over discrete sets under given constraints. The primary motivation for discrete SPSA is to solve a class of resource allocation problems wherein the goal is to distribute a finite number of discrete resources to finitely many users in such a way as to optimize a specified objective function. The basic algorithm and the application of the algorithm to the optimal resource allocation problem is discussed and simulation results are presented which illustrate its performance.
منابع مشابه
Discrete Optimization via SPSA
We consider the use of a fixed gain version of SPSA (simultaneous perturbation stochastic approximation) for optimizing a class of discrete functions. The procedure has been modified to obtain an optimization method that is applicable to cost functions defined on a grid of points in Euclidean p-space having integer components. We discuss some related results on fixed gain SPSA and describe an a...
متن کاملConstrained Non-Renewable Resource Allocation in Metagraphs with Discrete Random Times
In this paper, it is supposed that a project can be shown as a metagraph. The duration of activities are discrete random variables with known probability function, also one kind of consumable and constrained resource is required to execute each activity of the project.The objective of this paper is to maximize the probability of completion of stochastic metagraph before the due date of the proj...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملAn Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...
متن کاملConstrained consumable resource allocation in alternative stochastic networks via multi-objective decision making
Many real projects complete through the realization of one and only one path of various possible network paths. Here, these networks are called alternative stochastic networks (ASNs). It is supposed that the nodes of considered network are probabilistic with exclusive-or receiver and exclusive-or emitter. First, an analytical approach is proposed to simplify the structure of t...
متن کامل