Performance analysis of re - entrant ̄ ow shop with single - job and batch machines using mean value analysis
نویسندگان
چکیده
We propose an approximate method based on the mean value analysis for estimating the average performance of re-entrant ̄ ow shop with single-job machines and batch machines. The main focus is on the steady-state averages of the cycle time and the throughput of the system. Characteristics of the re-entrant ̄ ow and inclusion of the batch machines complicate the exact analysis of the system. Thus, we propose an approximate analytic method for obtaining the mean waiting time at each bu er of the workstation and a heuristic method to improve the result of the analytic method. We compare the Authors: Y. Park, S. Kim and C.-H. Jun, Department of Industrial Engineering, Pohang University of Science and Technology, San 31 Hyoja-dong, Pohang, 790-784, South Korea, e-mail: sookim@ postech.ac.kr YOUNGSHIN PARK is a PhD candidate in Industrial Engineering at Pohang University of Science and Technology in Korea. She has received Bachelor and Master of Science in Industrial Engineering from Pohang University of Science and Technology. Her current research activities focus on performance analysis of production systems. SOOYOUNG KIM is Associate Professor of the Department of Industrial Engineering at Pohang University of Science and Technology (`POSTECH’) in Korea. He received his BS in Mechanical Engineering from Seoul National University, MS in Manufacturing Engineering from Korea Advanced Institute of Science and Technology, and his PhD in IE from University of California at Berkeley, USA in 1988. From 1989 to 1993, he was Assistant Professor of Industrial Engineering at Rutgers University in New Jersey, USA. His research interests are in production planning, scheduling and control, especially in semiconductor manufacturing processes. He has published in IIE Transactions, International J ournal of Production Research, European J ournal of OR, International J ournal of CIM , etc. CHI-HYUCK JUN is Associate Professor in Industrial Enginering at Pohang University of Science and Technology. He received a BS in Mineral and Petroleum Engineering from Seoul National University in 1977, MS in Industrial Engineering from Korea Advanced Institute of Science and Technology in 1979, and PhD in Operations Research from University of California, Berkeley, in 1986. He is interested in performance analysis of communication systems and production systems. He has published in Probability in the Eng ineering and Informational Sciences, Microelectronics & Reliability, IEICE Transactions on Communications, etc. Production Planning & Control ISSN 0953± 7287 print/ISSN 1366± 5871 online # 2000 Taylor & Francis Ltd http://www.tandf.co.uk/journals results of the proposed approach with a simulation study using some numerical examples.
منابع مشابه
Mean value analysis of re-entrant line with batch machines and multi-class jobs
We propose an approximate approach for estimating the performance measures of the re-entrant line with single-jobmachines and batch machines based on the mean value analysis (MVA) technique.Multi-class jobs are assumed to be processed in predetermined routings, in which some processes may utilize the same machines in the re-entrant fashion. The performance measures of interest are the steady-st...
متن کاملSolving Re-entrant No-wait Flow Shop Scheduling Problem
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting ...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملHybrid tabu search for re-entrant permutation flow-shop scheduling problem
The assumption of classical shop scheduling problems that each job visits each machine only once (Baker, 1974) is often violated in practice. A new type of manufacturing shop, the reentrant shop has recently attracted attention. The basic characteristic of a re-entrant shop is that a job visits certain machines more than once. For example, in semiconductor manufacturing, consequently, each wafe...
متن کاملElectromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and tardiness
In this paper, we study a flow shop batch processing machines scheduling problem. The fuzzy due dates are considered to make the problem more close to the reality. The objective function is taken as the weighted sum of fuzzy earliness and fuzzy tardiness. In order to tackle the given problem, we propose a hybrid electromagnetism-like (EM) algorithm, in which the EM is hybridized with a diversi...
متن کامل