Iterated Greedy Algorithms for a Real-World Cyclic Train Scheduling Problem
نویسندگان
چکیده
In this paper, we develop heuristic algorithms for a complex locomotive scheduling problem in freight transport that arises at Deutsche Bahn AG. While for small instances an approach based on an ILP formulation and its solution by a commercial ILP solver was rather successful, it was found that effective heuristic algorithms are needed for providing better initial upper bounds and for tackling large instances. The main contribution of this paper is the development of heuristic algorithms that strongly improve over the performance of the greedy algorithm used in the previous research efforts. The development process was done on a step-by-step basis ranging from improvements over the initial greedy construction heuristic, the development of a simple local search algorithm, the further extension to an iterated greedy procedure to the adoption of population-based stochastic local search methods. Our computational results show that the iterated greedy algorithm combined with a simple local search is a powerful algorithm for this real-world freight train scheduling problem.
منابع مشابه
An Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria
In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...
متن کاملAn Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time
This paper explores the flexile flow lines where setup times are sequence- dependent. The optimization criterion is the minimization of total weighted completion time. We propose an iterated greedy algorithm (IGA) to tackle the problem. An experimental evaluation is conducted to evaluate the proposed algorithm and, then, the obtained results of IGA are compared against those of some other exist...
متن کاملAn Iterated Greedy Algorithm for Solving the Blocking Flow Shop Scheduling Problem with Total Flow Time Criteria
In this paper, we propose an iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time minimization objective. The steps of this algorithm are designed very efficient. For generating an initial solution, we develop an efficient constructive heuristic by modifying the best known NEH algorithm. Effectiveness of the proposed iterated greedy algorithm is t...
متن کاملA Mathematical Model and Grouping Imperialist Competitive Algorithm for Integrated Quay Crane and Yard Truck Scheduling Problem with Non-crossing Constraint
In this research, an integrated approach is presented to simultaneously solve quay crane scheduling and yard truck scheduling problems. A mathematical model was proposed considering the main real-world assumptions such as quay crane non-crossing, precedence constraints and variable berthing times for vessels with the aim of minimizing vessels completion time. Based on the numerical results, thi...
متن کاملEfficient Algorithms for Just-In-Time Scheduling on a Batch Processing Machine
Just-in-time scheduling problem on a single batch processing machine is investigated in this research. Batch processing machines can process more than one job simultaneously and are widely used in semi-conductor industries. Due to the requirements of just-in-time strategy, minimization of total earliness and tardiness penalties is considered as the criterion. It is an acceptable criterion for b...
متن کامل