Valuation of Generation Assets with Unit Commitment Constraints under Uncertain Fuel Prices
نویسندگان
چکیده
Market based valuation of generation assets is a critical problem in competitive power markets. Previous approaches to this problem has included modeling the cash flow from a generator as a spread option between electricity and fuel prices, which ignores the effect of flexibility and startup costs. Simulation based approaches with full unit commitment constraint have been presented, but they are computationally extremely demanding. In this report, a principal component based model for electricity prices is applied. It is shown how this approach can reduce the unit commitment problem to two stage dynamic programming (DP) problem. The information gained by solving the DP for possible electricity and fuel price states, is stored in a lookup table. This table is used to map simulated fuel and electricity price states to generator cash flow. As a result we are able to perform simulation based valuation of generators over multi-year periods, with minimal computational complexity.
منابع مشابه
Incorporating Operational Characteristics and Start-up Costs in Option-based Valuation of Power Generation Capacity
We describe a stochastic dynamic programming approach for “real option” based valuation of electricity generation capacity incorporating operational constraints and startup costs. Stochastic prices of electricity and fuel are represented by recombining multinomial trees. Generators are modeled as a strip of cross commodity call options with a delay and a cost imposed on each option exercise. We...
متن کاملShort-Term Generation Asset Valuation: A Real Options Approach
This paper discusses using real options to value power plants with unit commitment constraints over a short-term period. We formulate the problem as a multistage stochastic problem and propose a solution procedure that integrates forward-moving Monte Carlo simulation with backward-moving dynamic programming. We assume that the power plant operator maximizes expected profit by deciding in each h...
متن کاملIncorporating Wind Power Generation And Demand Response into Security-Constrained Unit Commitment
Wind generation with an uncertain nature poses many challenges in grid integration and secure operation of power system. One of these operation problems is the unit commitment. Demand Response (DR) can be defined as the changes in electric usage by end-use customers from their normal consumption patterns in response to the changes in the price of electricity over time. Further, DR can be also d...
متن کاملStochastic Electric Power Generation Unit Commitment in Deregulated Power Market Environment
Utilities participating in deregulated markets observe increasing uncertainty in load (i.e., demand for electric power) and prices for fuel and electricity on spot and contract markets. This study proposes a new formulation of the unit commitment problem of electric power generators in a restructured electricity market. Under these conditions, an electric power generation company will have the ...
متن کاملShort-Term Generation Asset Valuation
In this paper we present a method for valuing a power plant over a short term period using Monte Carlo sim ulation The power plant valuation problem is formu lated as a multi stage stochastic problem We assume there are hourly markets for both electricity and the fuel used by the generator and their prices follow some Ito processes At each hour the power plant opera tor must decide to run or no...
متن کامل