Comprehensive Evaluation of Drilling Risk Based on Unascertained Measurement

نویسندگان

  • Jun'e Liu
  • Rong Wang
چکیده

Drilling engineering is not only a systematic engineering that involves several workcategories, work procedures,intersectant and continuous operation, but also is a concealed underground engineering. There are uncertain factors in drilling projects, which have the characteristics of high investment and risk. On the basis of the overall analysis of the two factors of geology and engineering, the risk evaluation model of drilling project is established by creating the hierarchy structure of drilling risk and introducing the uncertain measure comprehensive evaluation method. Taking Yanchang Oilfield 21 Well as an example, a comprehensive evaluation is studied and then draw a reliable conclusion. Therefore, unascertained measure evaluation method is applicable, efficient, and necessary to promote safety production, which provides the new way for risk assessment of drilling project..

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Vulnerability Assessment of Regional Geological Disasters Based on Unascertained Measurement Theory

Based on unascertained measurement theory, a comprehensive evaluation method to propose the vulnerability of regional geological disasters was presented in this paper. The function of unascertained measure of all evaluation indexes was established, the weights for indexes was calculated by entropy weight theory, and a result of the vulnerability of regional geological disasters has been carried...

متن کامل

Risk Assessment of Oil and Gas Drilling Engineering Cooperation Project Based on Fuzzy Comprehensive Evaluation

Abstract This paper establishes the risk assessment index system according to characteristics of oil and gas drilling engineering cooperation project. After modularizing risk indexes of oil and gas drilling engineering cooperation project into eight clusters, risks are evaluated on the basis of multi-level fuzzy comprehensive evaluation method. The study is to construct risk assessment indexes ...

متن کامل

Risk Assessment for Construction Projects Contracting Based on Unascertained Sets

This paper utilizes unascertained sets to analyze general contracting risk of construction projects. Firstly, principal component method was used to process a number of listed general contracting risk indices. The representative indices from principal component analysis process substitute for the primary indexes. Thus subjective random problem in choosing indices can be avoided. Then, risk fact...

متن کامل

Comprehensive Evaluation of Working Environment under Mining Based on Unascertained Analytic Hierarchical Model

Working environment under mining plays an important role in safety of coal mines. The paper analyzes the eight factors of working environment under mining: gas density, dust, temperature, humidity level, air velocity, and harmful air, noise, and working space, calculates the weight of factors and establishes the comprehensive evaluation model with analytic hierarchical model based on unascertai...

متن کامل

Evaluation of the Ecological Risk for the Tunnel Drilling Waste of Tehran-Shomal Highway on Chaloos River

Drilling material from the tunnel of the Tehran-Shomal highway was estimated to be about 2.5 Million Cubic Meters by the project authorities. Sadly, from the beginning, the drilling materials had been deposited on the open space in the floodplain of the Chaloos river with slightest environmental considerations. During the previous years, weathering and leaching from the drilled materials beside...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010