Resource-Activity Critical-Path Method for Construction Planning
نویسندگان
چکیده
In this paper, a practical method is developed in an attempt to address the fundamental matters and limitations of existing methods for critical-path method ~CPM! based resource scheduling, which are identified by reviewing the prior research in resourceconstrained CPM scheduling and repetitive scheduling. The proposed method is called the resource-activity critical-path method ~RACPM!, in which ~1! the dimension of resource in addition to activity and time is highlighted in project scheduling to seamlessly synchronize activity planning and resource planning; ~2! the start/finish times and the floats are defined as resource-activity attributes based on the resource-technology combined precedence relationships; and ~3! the ‘‘resource critical’’ issue that has long baffled the construction industry is clarified. The RACPM is applied to an example problem taken from the literature for illustrating the algorithm and comparing it with the existing method. A sample application of the proposed RACPM for planning a footbridge construction project is also given to demonstrate that practitioners can readily interpret and utilize a RACPM schedule by relating the RACPM to the classic CPM. The RACPM provides schedulers with a convenient vehicle for seamlessly integrating the technology/process perspective with the resource use perspective in construction planning. The effect on the project duration and activity floats of varied resource availability can be studied through running RACPM on different scenarios of resources. This potentially leads to an integrated scheduling and cost estimating process that will produce realistic schedules, estimates, and control budgets for construction. DOI: 10.1061/~ASCE!0733-9364~2003!129:4~412! CE Database subject headings: Construction planning; Project management; Scheduling; Resource management; Critical path
منابع مشابه
A Model for Automated Generation of Resource-driven Construction Schedule for Housing Industry
The efficacy of managing a construction project mainly depends on proper planning and scheduling. Mass housing projects are highly repetitive in nature, as the methods used for construction are often repetitive or cyclic. Resources are therefore being deployed repeatedly for the similar or identical tasks in these projects. In order to eradicate delays in mobilizing resources, an efficient reso...
متن کاملAN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK
Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...
متن کاملAnalysis of critical paths in a project network with random fuzzy activity times
Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...
متن کامل4D integrated technologies and process simulation of progress of the project management methods
Effective and detailed planning of large-scale, complex construction projects is of great importance to fulfilling project cost and time objectives. At Tsinghua University of China and The Hong Kong Polytechnic University, the four dimensional-computer aided design (4D construction operations simulation methodology have been researched for years respectively, resulting in innovative, in constru...
متن کاملA new approach for automation of location-based earthwork scheduling in road construction projects
a r t i c l e i n f o Accurate information of working locations is vital for efficient resource planning, safety of the construction site and monitoring the weekly progress of earthworks, which is missing in the existing linear scheduling methods. Construction managers have to depend on the subjective decisions for resources allocation and progress monitoring from location aspects. This has cau...
متن کامل