High breakdown estimation methods for Phase I multivariate control charts

نویسندگان

  • Willis A. Jensen
  • Jeffrey B. Birch
  • William H. Woodall
چکیده

The goal of Phase I monitoring of multivariate data is to identify multivariate outliers and step changes so that the estimated control limits are sufficiently accurate for Phase II monitoring. High breakdown estimation methods based on the minimum volume ellipsoid (MVE) or the minimum covariance determinant (MCD) are well suited to detecting multivariate outliers in data. However, they are difficult to implement in practice due to the extensive computation required to obtain the estimates. Based on previous studies, it is not clear which of these two estimation methods is best for control chart applications. The comprehensive simulation study here gives guidance for when to use which estimator, and control limits are provided. High breakdown estimation methods such as MCD and MVE, can be applied to a wide variety of multivariate quality control data.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Phase II monitoring of multivariate simple linear profiles with estimated parameters

In some applications of statistical process monitoring, a quality characteristic can be characterized by linear regression relationships between several response variables and one explanatory variable, which is referred to as a “multivariate simple linear profile.” It is usually assumed that the process parameters are known in Phase II. However, in most applications, this assumption is viola...

متن کامل

Determining the Sample size for Estimation of the CCC-R Control Chart Parameters Based on Estimation Costs

In today's highly competitive industrial environment due to fast technology development, quality practitioners will to detect out-of-control situations and take actions whenever is necessary as soon as possible. Accordingly, new statistical procedures have been enhanced incessantly both to handle high yield processes along with looking for methods of minimizing all quality cost. CCC-r chart, th...

متن کامل

Bayesian Estimation of Change Point in Phase One Risk Adjusted Control Charts

Use of risk adjusted control charts for monitoring patients’ surgical outcomes is now popular.These charts are developed based on considering the patient’s pre-operation risks. Change point detection is a crucial problem in statistical process control (SPC).It helpsthe managers toanalyzeroot causes of out-of-control conditions more effectively. Since the control chart signals do not necessarily...

متن کامل

Title: On the Statistical Performance of Quality Control Charts with Estimated Parameters

Under estimated in-control parameters, the Phase II control chart performance is expected to vary among practitioners due to the use of different Phase I data sets. Accordingly, the typical measure of Phase II control chart performance, the average run length (ARL), becomes a random variable. In the literature, control charts with estimated parameters were assessed and the appropriate amounts o...

متن کامل

The effect of parameter estimation on Phase II control chart performance in monitoring financial GARCH processes with contaminated data

The application of control charts for monitoring financial processes has received a greater focus after recent global crisis. The Generelized AutoRegressive Conditional Heteroskedasticity (GARCH) time series model is widely applied for modelling financial processes. Therefore, traditional Shewhart control chart is developed to monitor GARCH processes. There are some difficulties in financial su...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Quality and Reliability Eng. Int.

دوره 23  شماره 

صفحات  -

تاریخ انتشار 2007