An adaptive Simulated Annealing-based satellite observation scheduling method combined with a dynamic task clustering strategy
نویسندگان
چکیده
Efficient scheduling is of great significance to rationally make use of scarce satellite resources. Task clustering has been demonstrated to realize an effective strategy to improve the efficiency of satellite scheduling. However, the previous task clustering strategy is static. That is, it is integrated into the scheduling in a two-phase manner rather than in a dynamic fashion, without expressing its full potential in improving the satellite scheduling performance. In this study, we present an adaptive Simulated Annealing based scheduling algorithm aggregated with a dynamic task clustering strategy (or ASA-DTC for short) for satellite observation scheduling problems (SOSPs). First, we develop a formal model for the scheduling of Earth observing satellites. Second, we analyze the related constraints involved in the observation task clustering process. Thirdly, we detail an implementation of the dynamic task clustering strategy and the adaptive Simulated Annealing algorithm. The adaptive Simulated Annealing algorithm is efficient, with the endowment of some sophisticated mechanisms, i.e. adaptive temperature control, tabu-list based revisiting avoidance mechanism, and intelligent combination of neighborhood structures. Finally, we report on experimental simulation studies to demonstrate the competitive performance of ASA-DTC. Moreover, we show that ASA-DTC is especially effective when SOSPs contain a large number of targets or these targets are densely distributed in a certain area.
منابع مشابه
A cloud-based simulated annealing algorithm for order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling
Make-to-order is a production strategy in which manufacturing starts only after a customer's order is received; in other words, it is a pull-type supply chain operation since manufacturing is carried out as soon as the demand is confirmed. This paper studies the order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling with MTO production strategy, the objec...
متن کاملAn Integrated Model of Project Scheduling and Material Ordering: A Hybrid Simulated Annealing and Genetic Algorithm
This study aims to deal with a more realistic combined problem of project scheduling and material ordering. The goal is to minimize the total material holding and ordering costs by determining the starting time of activities along with material ordering schedules subject to some constraints. The problem is first mathematically modelled. Then a hybrid simulated annealing and genetic algorithm is...
متن کاملQuay Cranes and Yard Trucks Scheduling Problem at Container Terminals
A bi-objective mathematical model is developed to simultaneously consider the quay crane and yard truck scheduling problems at container terminals. Main real-world assumptions, such as quay cranes with non-crossing constraints, quay cranes’ safety margins and precedence constraints are considered in this model. This integrated approach leads to better efficiency and productivity at container te...
متن کاملMulti-satellite observation integrated scheduling method oriented to emergency tasks and common tasks
Satellite observation scheduling plays a significant role in improving the efficiency of satellite observation systems. Although many scheduling algorithms have been proposed, emergency tasks, characterized as importance and urgency (e.g., observation tasks orienting to the earthquake area and military conflict area), have not been taken into account yet. Therefore, it is crucial to investigate...
متن کاملDesigning a Robust Control Scheme for Robotic Systems with an Adaptive Observer
This paper introduces a robust task-space control scheme for a robotic system with an adaptive observer. The proposed approach does not require the availability of the system states and an adaptive observer is developed to estimate the state variables. These estimated states are then used in the control scheme. First, the dynamic model of a robot is derived. Next, an observer-based robust contr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CoRR
دوره abs/1401.6098 شماره
صفحات -
تاریخ انتشار 2014