MaCO: A Tool For Aiding Management Of Cost Overrun Of A Software Development Project

نویسندگان

  • Kawal Jeet
  • Renu Dhir
چکیده

„Cost Overrun‟ is one of the major factors for the failure of a software development project. The major reason for this difficulty is poor analysis and management of risk factors. This paper aims to find out the ways to manage and predict the overrun in this cost by using Influence Diagram (ID). Two major risk factors having adverse impact on the cost are decided to be: (1) creeping user requirements (2) use of unnecessary features in the project. An integration of impacts of these factors with experts‟ opinion and with the existing databases (consisting of probability of occurrence of risk factors) helped us to create an ID based system that is capable to model the cost overrun. This system can be used by the software manager at any stage during software development..

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed t...

متن کامل

A Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)

Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...

متن کامل

مروری بر روش‌های تخمین هزینه نرم‌افزار مبتنی بر یادگیری ماشین

Software project management software is the most important activity in software development, because it contains the whole software development process, from beginning to end. Software cost estimation is a challenge task in the software project management. It is an old activity in computer industry from 1940s and has been developed many times. Effort, only covers part of the cost of a software ...

متن کامل

Project Cost Overrun Simulation in Software Product Line Development

The cost of a Software Product Line (SPL) development project sometimes exceeds the initially planned cost, because of requirements volatility and poor quality. In this paper, we propose a cost overrun simulation model for time-boxed SPL development. The model is an enhancement of a previous model, specifically now including: consideration of requirements volatility, consideration of unplanned ...

متن کامل

Bridging the semantic gap for software effort estimation by hierarchical feature selection techniques

Software project management is one of the significant activates in the software development process. Software Development Effort Estimation (SDEE) is a challenging task in the software project management. SDEE is an old activity in computer industry from 1940s and has been reviewed several times. A SDEE model is appropriate if it provides the accuracy and confidence simultaneously before softwa...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010