Crane scheduling in a warehouse storing steel coils
نویسندگان
چکیده
This article studies a single-crane scheduling problem in a warehouse where steel coils are stored in two levels. A given set of coils is to be retrieved from their designated places. If a required coil at the lower level is blocked by one or two coils at the upper level, to retrieve it, the blocking coils must be first moved to other positions. The considered problem is to determine the new positions and the required crane movements so that all coils are retrieved in the shortest possible time. A mixed-integer linear programming model is formulated for the problem and a sequential solution approach is implemented. A dynamic programming algorithm is proposed for optimally solving a restricted case. Based on the analysis of a special case, a heuristic algorithm is proposed for the general case and its worst-case performance is analyzed. The average performances of the solution approaches are computationally evaluated. The results show that the proposed heuristic algorithms are capable of generating good quality solutions.
منابع مشابه
A hybrid two-stage transportation and batch scheduling problem
We study the coordinated scheduling problem of hybrid batch production on a single batching machine and two-stage transportation connecting the production, where there is a crane available in the first-stage transportation that transports jobs from the warehouse to the machine and there is a vehicle available in the second-stage transportation to deliver jobs from the machine to the customer. A...
متن کاملA simulation-based immune genetic algorithm for the crane scheduling problem
The paper studied a multi-machine and multi-task warehouse crane scheduling problem. The collision between adjacent cranes needs to be avoided in the scheduling problem. Considering the involved operation requirement and condition, a process simulation model was formulated to evaluate a candidate crane schedule through rehearsing the crane operation process. Based on the process simulation, an ...
متن کاملYard crane scheduling in port container terminals using genetic algorithm
Yard crane is an important resource in container terminals. Efficient utilization of the yard crane significantly improves the productivity and the profitability of the container terminal. This paper presents a mixed integer programming model for the yard crane scheduling problem with non- interference constraint that is NPHARD in nature. In other words, one of the most important constraints in...
متن کاملAddressing a Coordinated Quay Crane Scheduling and Assignment Problem by Red Deer Algorithm
Nowadays, there is much attention for planning of container terminals in the global trade centers. The high cost of quay cranes motivates both scholars and industrial practitioners especially in the last decade to develop novel optimization models to address this dilemma. This study proposes a coordinated optimization model to cover both Quay Crane Scheduling Problem (QCSP) and Quay Crane Assig...
متن کاملA Modelling and Tabu Search Heuristic for a Continuous Galvanizing Line Scheduling Problem
With good mechanical properties and corrosion-resistance, galvanized coils are used in many fields nowadays, such as auto industry and household appliance industry. Because of high additional value of galvanized product, steel plants pay much more attention on how to make continuous galvanizing lines (CGL) run efficiently. In this paper, we address a scheduling problem of continuous galvanizing...
متن کامل