The finite horizon investor problem with a budget constraint
نویسنده
چکیده
We study a model that incorporates a budget constraint in a decision making problem. Our goal is to maximize the expected wealth, where in each time period we can either stop the business getting our current wealth or to continue one additional time period and getting a random revenue. We show that when the wealth is scalar, the problem is NP-hard and we provide an FPTAS. However, when the wealth is vector with at least two components the problem cannot be approximated.
منابع مشابه
A Tunned-parameter Hybrid Algorithm for Dynamic Facility Layout Problem with Budget Constraint using GA and SAA
A facility layout problem is concerned with determining the best position of departments, cells, or machines on the plant. An efficient layout contributes to the overall efficiency of operations. It’s been proved that, when system characteristics change, it can cause a significant increase in material handling cost. Consequently, the efficiency of the current layout decreases or is lost and it ...
متن کاملProfit maximization solid transportation problem under budget constraint using fuzzy measures
Fixed charge solid transportation problems are formulated as profit maximization problems under a budget constraint at each destination. Here item is purchased in different depots at different prices. Accordingly the item is transported to different destinations from different depots using different vehicles. Unitsare sold from different destinations to the customers at different selling prices...
متن کاملThree Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملUtility Maximization under Solvency Constraints and Unhedgeable Risks
We consider the utility maximization problem for an investor who faces a solvency or risk constraint in addition to a budget constraint. The investor wishes to maximize her expected utility from terminal wealth subject to a bound on her expected solvency at maturity. We measure solvency using a solvency function applied to the terminal wealth. The motivation for our analysis is an optimal inves...
متن کاملMulti-item inventory model with probabilistic demand function under permissible delay in payment and fuzzy-stochastic budget constraint: A signomial geometric programming method
This study proposes a new multi-item inventory model with hybrid cost parameters under a fuzzy-stochastic constraint and permissible delay in payment. The price and marketing expenditure dependent stochastic demand and the demand dependent the unit production cost are considered. Shortages are allowed and partially backordered. The main objective of this paper is to determine selling price, mar...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Inf. Process. Lett.
دوره 104 شماره
صفحات -
تاریخ انتشار 2007