A Profit-Based Maintenance Scheduling of Thermal Power Units in Electricity Market

نویسندگان

  • Smajo Bisanovic
  • Mensur Hajro
چکیده

This paper presents one comprehensive modelling approach for maintenance scheduling problem of thermal power units in competitive market. This problem is formulated as a 0/1 mixedinteger linear programming model. Model incorporates long-term bilateral contracts with defined profiles of power and price, and weekly forecasted market prices for market auction. The effectiveness of the proposed model is demonstrated through case study with detailed discussion. Keywords—Maintenance scheduling; bilateral contracts; market prices; profit

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Maintenance Scheduling of Thermal Power Units in Electricity Market

– The objective of this paper is to present a decision-based function to determine the optimal maintenance scheduling strategy of thermal power units taking into account the particular obligations of Generation Company, such as bilateral contracts. Opportunities for energy selling at the electricity market as well as a detailed modeling of the power plants are considered in the optimization pro...

متن کامل

Energy Scheduling in Power Market under Stochastic Dependence Structure

Since the emergence of power market, the target of power generating utilities has mainly switched from cost minimization to revenue maximization. They dispatch their power energy generation units in the uncertain environment of power market. As a result, multi-stage stochastic programming has been applied widely by many power generating agents as a suitable tool for dealing with self-scheduling...

متن کامل

Optimal Scheduling of Coordinated Wind-Pumped Storage-Thermal System Considering Environmental Emission Based on GA Based Heuristic Optimization Algorithm

The integration of renewable wind and pumped storage with thermal power generation allows for dispatch of wind energy by generation companies (GENCOs) interested in participation in energy and ancillary services markets. However, to realize the maximum economic profit, optimal coordination and accounting for reduction in cost for environmental emission is necessary. The goal of this study is to...

متن کامل

Stochastic Short-Term Hydro-Thermal Scheduling Based on Mixed Integer Programming with Volatile Wind Power Generation

This study addresses a stochastic structure for generation companies (GenCoʼs) that participate in hydro-thermal self-scheduling with a wind power plant on short-term scheduling for simultaneous reserve energy and energy market. In stochastic scheduling of HTSS with a wind power plant, in addition to various types of uncertainties such as energy price, spinning /non-spinning reserve prices, unc...

متن کامل

Hydro Generating Units Maintenance Scheduling Using Benders Decomposition

Preventive generating units maintenance scheduling is among the most vital decisions which electricity generating companies have to make. Effective generating units maintenance helps reduce the forced outage rates. Therefore, rigorous technical restrictions have to be respected by all means. Since the economical factor, i.e. profit generation, was not the prime driver in investments, the mainte...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012