Project failure en masse: a study of loose budgetary control in ISD projects
نویسنده
چکیده
Received: 12 May 2009 Revised: 17 September 2009 2nd Revision: 1 December 2009 3rd Revision: 12 January 2010 4th Revision: 18 January 2010 Accepted: 19 January 2010 Abstract This paper investigates the tightness of budgetary control over projects in a large systems development multinational. This represents a case of extreme information systems development (ISD) failure en masse, where all but two of the 22 projects in a business unit went over budget, causing senior executives to refocus their strategic priorities and cancel all current and potential projects that followed. This study focuses specifically on the two best performing (12 and 4% under budget) and worst performing (223 and 320% over budget) of these projects. Using a framework drawn from control systems theory, this study examines the ‘tightness’ of budgetary control exerted over each project, and what was done or could have been done to avert such failure. The study then identifies a set of emerging factors affecting tight budgetary control in ISD. European Journal of Information Systems advance online publication, 18 May 2010; doi:10.1057/ejis.2010.7
منابع مشابه
علل شکست و عدم نتیجه گیری مناسب از اجرای طرح های تحقیقاتی مصوب شورای پژوهشی دانشگاه علوم پزشکی تهران، 1364 تا پایان سال 1379
The major activity for vice chancellor for research at Tehran University of Medical Sciences (TUMS) is to monitor research projects undertaken by the academic staff. Sometimes projects have been failed in meeting their objectives. The aim of this project was the evaluation of the failure of the research projects at TUMS from the establishment date to 1379. A case-control survey was designed and...
متن کاملKNOWLEDGE MANAGEMENT TO INVESTIGATE THE FAILURE FACTORS IN MANAGING OF GAS AND OIL INDUSTRY TRANSMISSION LINES PROJECTS
In this study the challenges of managing the civil projects in oil and gas industry over recent years that failed were investigated. For this purpose, the relevant cases and their effectiveness were categorized by analyzing research data obtained from the questionnaire results. The results obtained from the research showed that there is a positive and significant relationship between the projec...
متن کاملIndividual Players in a Team Sport: Stakeholder Change in Commitment in ISD Projects
Information System Development (ISD) projects fail at an alarming rate; many of these failures result from managerial rather than technical difficulties. One of the principal management issues that affect ISD success is stakeholder commitment to the ISD process. To date, the majority of the ISD literature has not examined changes in commitment over time and how these changes may affect the succ...
متن کاملA MULTI-OBJECTIVE OPTIMIZATION MODEL FOR PROJECT PORTFOLIO SELECTION CONSIDERING AGGREGATE COMPLEXITY: A CASE STUDY
Existing project selection models do not consider the complexity of projects as a selection criterion, while their complexity may prolong the project duration and even result in its failure. In addition, existing models cannot formulate the aggregate complexity of the selected projects. The aggregated complexity is not always equal to summation of complexity of projects because of possible syne...
متن کاملOptimizing Anterior En Masse Retraction with Miniscrew Anchorage
In severely protrusive patients, skeletal anchorage from miniscrew is often used to avoid anchorage loss with preferred miniscrew location near centre of resistance (Cres) of posterior teeth. Biomechanical requirement for directing retraction force towards Cres of posterior teeth demands the insertion of miniscrew in loose mucosa, where risk of infection and failure increases. In addition, unde...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- EJIS
دوره 19 شماره
صفحات -
تاریخ انتشار 2010