Remanufacturing Scheduling and Control: Where Are We?
نویسندگان
چکیده
We examine our progress in scheduling remanufacturing operations by reviewing the literature in detail. We individually examine published research in scheduling disassembly, remanufacturing/repair, and reassembly operations and their integration. The objective functions/performance criteria, quantitative methodologies, and complexities/issues are examined. Finally, an overall assessment of our progress and continued research needs are presented.
منابع مشابه
Study on Production Scheduling System for Project-based Remanufacturing
Project-based remanufacturing is a kind of service-driven remanufacturing mode, and production scheduling is one of the important issues for project-based remanufacturing system operation. Many uncertain factors exist in the remanufacturing system which lead to the traditional single production scheduling model and approach can not satisfy the requirements for production scheduling in the proce...
متن کاملA two-stage artificial bee colony algorithm scheduling flexible job-shop scheduling problem with new job insertion
This study addresses the scheduling problem in remanufacturing engineering. The purpose of this paper is to model effectively to solve remanufacturing scheduling problem. The problem is modeled as flexible job-shop scheduling problem (FJSP) and is divided into two stages: scheduling and re-scheduling when new job arrives. The uncertainty in timing of returns in remanufacturing is modeled as new...
متن کاملThe preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...
متن کاملMulti-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing
We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the optimal cycle time with a mixed integer programming (MIP) formulation of the problem given a fixed cycl...
متن کاملPRODUCTION INVENTORY MODEL FOR DETERIORATING ITEMS WITH SHORTAGES AND SALVAGE VALUE UNDER REVERSE LOGISTICS
In this paper, a production inventory model is developed for the business enterprise which consists of three wings. The first wing is for manufacturing new items, the second wing is for collecting the returned items, while third wing is for remanufacturing the returned item. In this model we consider the fact that the storage item is deteriorated during storage periods and salvage value is inco...
متن کامل