A constraint programming-based approach to a large-scale energy management problem with varied constraints - A solution approach to the ROADEF/EURO Challenge 2010

نویسندگان

  • Felix Brandt
  • Reinhard Bauer
  • Markus Völker
  • Andreas Cardeneo
چکیده

This paper addresses a large-scale power plant maintenance scheduling and production planning problem, which has been proposed by the ROADEF/EURO Challenge 2010. We develop two lower bounds for the problem: a greedy heuristic and a flow network for which a minimum cost flow problem has to be solved. Furthermore, we present a solution approach that combines a constraint programming formulation of the problem with several heuristics. The problem is decomposed into an outage scheduling and a production planning phase. The first phase is solved by a constraint program, which additionally ensures the feasibility of the remaining problem. In the second phase we utilize a greedy heuristic—developed from our greedy lower bound—to assign production levels and refueling amounts for a given outage schedule. All proposed strategies are shown to be competitive in an experimental evaluation. F. Brandt ( ) · A. Cardeneo Logistics Systems Engineering, Research Center for Information Technology, Haid-und-Neu-Str. 10-14, 76131 Karlsruhe, Germany e-mail: [email protected] A. Cardeneo e-mail: [email protected] R. Bauer · M. Völker Institute of Theoretical Informatics, Karlsruhe Institute of Technology, Box 6980, 76128 Karlsruhe, Germany R. Bauer e-mail: [email protected] M. Völker e-mail: [email protected]

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Orchestrating CSP and Local Search to Solve a Large Scale Energy Management Problem

This paper presents a heuristic approach combining constraint satisfaction, local search and a constructive optimization algorithm for a large-scale energy management and maintenance scheduling problem. The methodology shows how to successfully combine and orchestrate different types of algorithms and produce competitive results. The local search for production assignment is a simple yet optima...

متن کامل

Solving a real-life, large-scale energy management problem

This paper introduces a three-phase heuristic approach for a large-scale energy management and maintenance scheduling problem. The problem is concerned with scheduling maintenance and refueling for nuclear power plants up to five years into the future, while handling a number of scenarios for future demand and prices. The goal is to minimize the expected total production costs. The first phase ...

متن کامل

Linear plus fractional multiobjective programming problem with homogeneous constraints using fuzzy approach

  We develop an algorithm for the solution of multiobjective linear plus fractional programming problem (MOL+FPP) when some of the constraints are homogeneous in nature. Using homogeneous constraints, first we construct a transformation matrix T which transforms the given problem into another MOL+FPP with fewer constraints. Then, a relationship between these two problems, ensuring that the solu...

متن کامل

Cockpit Crew Pairing Problem in Airline Scheduling: Shortest Path with Resources Constraints Approach

Increasing competition in the air transport market has intensified active airlines’ efforts to keep their market share by attaching due importance to cost management aimed at reduced final prices. Crew costs are second only to fuel costs on the cost list of airline companies. So, this paper attempts to investigate the cockpit crew pairing problem. The set partitioning problem has been used for ...

متن کامل

A New Compromise Decision-making Model based on TOPSIS and VIKOR for Solving Multi-objective Large-scale Programming Problems with a Block Angular Structure under Uncertainty

This paper proposes a compromise model, based on a new method, to solve the multi-objective large-scale linear programming (MOLSLP) problems with block angular structure involving fuzzy parameters. The problem involves fuzzy parameters in the objective functions and constraints. In this compromise programming method, two concepts are considered simultaneously. First of them is that the optimal ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • J. Scheduling

دوره 16  شماره 

صفحات  -

تاریخ انتشار 2013