Risk Evaluation of Qinghai–Tibet Power Grid Interconnection Project for Sustainability

نویسندگان

  • Cunbin Li
  • Yunqi Liu
  • Shuke Li
چکیده

Abstract: The Qinghai–Tibet power grid interconnection project is the first power transmission project with the highest altitude, longest transmission lines, longest distance running across the plateau frozen ground, and highest iron tower in the world. The risk evaluation on it can identify the overall risk level and key risk factors, which can reduce risk-induced loss and promote sustainable construction. In this paper, the risk of the Qinghai–Tibet power grid interconnection project was evaluated by employing a matter-element extension model under a fuzzy environment. After building the risk evaluation index system, the performances and weights of criteria were qualitatively judged by three groups of experts in different fields, and then the risk of the Qinghai–Tibet power grid interconnection project was rated by employing matter-element extension model. Meanwhile, the sensitivity analysis was performed to identify key risk criteria. The empirical results indicate the risk of the Qinghai–Tibet power grid interconnection project belongs to the “stronger” grade, tending to the “strongest” grade. “Social stability risk”, “altitude sickness seizure risk”, “permafrost-induced risk”, “severe weather-induced risk”, and “ecological destruction risk” are key sub-criteria, which should be paid more attention to when taking risk management measures. Finally, some countermeasures for key risks of the Qinghai–Tibet power grid interconnection project were given. The findings in this paper can provide references for engineering managers and related stakeholders.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Constructing the Qinghai-Tibet Railroad: new challenges to Chinese permafrost scientists

The new Qinghai-Tibet railroad will run across the world’s highest permafrost region for 632 km, of which about half is high-temperature and ice-rich permafrost. Therefore, an important and challenging engineering problem is the possible instability and sensitivity of permafrost. Chinese permafrost scientists are now making efforts to solve the problem by carrying out numerous field and laborat...

متن کامل

Integration of Gis, Gps and Gsm for the Qinghai-tibet Railway Information Management Planning

The Qinghai-Tibet Railway is a key project during China's Tenth Five-Year Plan period. It will be the longest and most elevated railroad built on highlands in the world. The construction and transport conditions are so complicated, such as permafrost, bitter coldness, lack of oxygen and ecological fragility. Therefore advanced technical measures and methods have been used during the constructio...

متن کامل

The Potential Geographical Distribution of Locusta migratoria tibetensis Chen (Orthoptera: Acrididae) in Qinghai-Tibet Plateau

Locusta migratoria tibetensis Chen (Orthoptera: Acrididae) is one of the most harmful species of Acrididae. It causes extensive damage to gramineous crops. The climate mapping program, CLIMEX 3.0, and the GIS software, ArcGIS 9.3, were used to model the current and future potential geographical distribution of L. m. tibetensis. The model predicts that, under current climatic conditions, L. m. t...

متن کامل

A Method for Ranking, Assessment and Evaluation of Sustainability Factors in Project

Nowadays, issues such as global climate change, poverty and inequity, and the unsustainable use of resources are driving organizations to incorporate the principles of sustainable development into projects. Sustainable development of organizations and companies requires consideration of all three sustainability dimensions: environmental, economic and social should integrate economic, social and...

متن کامل

Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method

Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016