i Preface This report describes the findings of my master thesis for the section of Water Resources Management of the faculty of Civil Engineering and Geosciences of the Delft University of T e c h n o l o g y (DU T). I h a v e e xe c u t e d th i s r e se a r c h w i t h g re a t p l e a s u r e a t W L | De l f t Hydraulics, who facilitated a work space during the total research period. Research was done on the uncertainties in discharge predictions, induced by weather uncertainties, with emphasis on finding an approach to map these uncertainties in a fast and effective way. The study is a result of a collaboration between the Delft University of Technology, WL | Delft Hydraulics, the Royal Dutch Meteorological Institute (KNMI) and the Institute for Inland Water Management and Waste Water Treatment (RIZA). With respect to the research content, my gratitude goes to my graduation committee and some other helpful people. From WL | Delft Hydraulics, I' d like to thank Ferdinand Diermanse for his daily supervision, especially during the start of my research. Also I' d like to thank Jaap Kwadijk for replacing Ferdinand as my supervisor during his field trips to remote countries. Albrecht Weerts has helped me a lot in getting to know Delft-FEWS and how to work with data files. He has been a terrific coach in hydrological modelling. From TU Delft, I' d like to give my warm thanks to my graduation professor, Huub Savenije, Wim Luxemburg and Hendrik Havinga, with whom I have had very useful conversations. Finally my gratitude goes to Eric Sprokkereef and Helmus van de Langemheen of RIZA and Sander Tijm of KNMI for their support and guidance of my activities. Thanks to them, I was able to present my findings to a broad public. I' d also like to thank Sander Tijm for his expertise on weather models and their performance. I was also supported in a broader sense than just research content by friends and family. I' d like to thank Teun and Miriam for peaceful moments, drinking a cup of coffee at the faculty every now and then. I thank my parents and sisters for their contact and cosiness during my total study time. Finally, …
منابع مشابه
Uncertainty assessment via Bayesian revision of ensemble streamflow predictions in the operational river Rhine forecasting system
[1] Ensemble streamflow forecasts obtained by using hydrological models with ensemble weather products are becoming more frequent in operational flow forecasting. The uncertainty of the ensemble forecast needs to be assessed for these products to become useful in forecasting operations. A comprehensive framework for Bayesian revision has been recently developed and applied to operational flood ...
متن کاملBayes Estimates of Flood Quantiles using the Generalised Gamma Distribution∗
In this paper, a Bayesian approach is proposed to estimate flood quantiles while taking statistical uncertainties into account. Predictive exceedance probabilities of annual maximum discharges are obtained using the threeand fourparameter generalised gamma distribution (without and with location parameter respectively). The parameters of this distribution are assumed to be random quantities rat...
متن کاملThe Floodrelief Internet-based Flood Forecasting Decision Support System
For operational flood forecasting and operational decision-makers, ready access to current and forecasted meteorological conditions is essential for initiating flood response measures and issuing flood warnings. Effective flood forecasting systems must provide reliable, accurate and timely forecasts for a range of catchments; from small rapidly responding urban areas, to large, more slowly resp...
متن کاملA probabilistic view on the August 2005 floods in the upper Rhine catchment
Appropriate precautions in the case of flood occurrence often require long lead times (several days) in hydrological forecasting. This in turn implies large uncertainties that are mainly inherited from the meteorological precipitation forecast. Here we present a case study of the extreme flood event of August 2005 in the Swiss part of the Rhine catchment (total area 34 550 km2). This event caus...
متن کاملA probabilistic view on the August 2005 floods in the upper Rhine catchment Jaun
Appropriate precautions in the case of flood occurrence often require long lead times (several days) in hydrological forecasting. This in turn implies large uncertainties that are mainly inherited from the meteorological precipitation forecast. Here we present a case study of the extreme flood event of August 2005 in the Swiss part of the Rhine catchment (total area 34 550 km2). This event caus...